Website Upgrade Incoming - we're working on a new look (and speed!) standby while we deliver the project

Mohammad Zahid

First Name: 
Mohammad
Last Name: 
Zahid

MUHAMMAD ZAHID                                          Mobile:+249919509744

E-Mail:zahidarain77@yahoo.com / zahidarain77@gmail.com

 

 Project Management,Planning and Control, Cost & Resource Management, Contract Management 

 

ACADEME

 

B-Tech. (Mechanical)from NED University of Engineering & Technology Karachi in 2002.

 

Other Courses / Trainings:

 

  • Primavera  Project Planner    

            Skill Development Council Karachi

  • MS Project                  

Faith college of Information Technology Hyderabad

 

  • Financial Management for Engineers

NED University of Engineering & Technology Karachi

 

  • Project planning & Control by using Primavera                                           

            Skill Development Council Karachi

 

IT Skills:

Operating System:

DOS, Windows 98, and Windows 2000 Pro, Windows XP

Software Package

Primavera P3, P5 & P6

MS Project

MS office

MS Word,

MS Excel,

 MS PowerPoint,

 MS Access

People soft

Coral DRAW

Photoshop

PERSONAL DOSSIER

 

Date of Birth:11th November 1974

 Address:  R-130 Salman Garden, Jamia Millia Road  Malir  Karachi

PAKISTAN.

 

Languages Known:English, Urdu, Hindi, Punjabi, Sindhi

 

ACHIEVEMENTS

 

CPECC (Sudan) Outstanding Employee award 2009.

 

PROFESSIONAL SNAPSHOT

  • A keen analyst with over 10 years of experience in Petro chemicals, Oil & Gas, Power and Infrastructure projects.
  • Excellent communication, analytical and problem solving skills
  • Good communication, organizational and time management skills
     Effective motivational, negotiation and interpersonal skills
  •  Good attention to detail
  •  Strong safety awareness
  •  Able to interpret and understand operating and technical processes
  •  Able to prepare and implement effective plans
  • Able to Work under pressure and can deliver within deadline constraints
  •  Highly motivated and with Equipped with good knowledge for Project Control system
  • Strong relationship management, communication skills with the ability to network with Project Members, Consultants, Contractors with consummate ease.
  • Significant experience in Project Planning, Scheduling & cost control.

COMPETENCIES RUN DOWN

  • Preparation & Tracking of the project master schedule and summary level curves and Man power histogram.
  • Generating and updating project monitoring packages schedules, progress measurement system, project reporting systems and invoicing systems etc.
  • Identification, monitoring & streamlining of critical paths running through the Project Master Schedule and individual contracts.
  • Reviewing & Evaluating Technical proposal for the project which includes Schedules Manpower & Resources.
  • Generating of regular Weekly/Monthly reports generation including ‘S’-curves for client & Management
  • Analyzing any major variance between the actual work in progress and the approved schedules.
  • Cost control by Optimization of Resources utilization
  • Understanding project work scope, needs and deliverables, contract milestones
  • Estimating budget quantities, costs, durations and resources.
  • Preparing the analysis reports for schedule & cost claims.
  • Analyzing overall discipline wise progress and efficiency reports, compare with the targets, and indicate areas where improvements are required.
  •  Assisting engineering & procurement disciplines in preparing technical document register & procurement tracking register and provide input as required.

 

 

EMPLOYMENT SCAN

 

Since Nov’07 with China Petroleum Engineering & Construction Corporation, Khartoum, Sudan, as Planning Engineer for Upstream Projects.

About Company: CPECC is an Engineering Procurement & Construction company in Khartoum, Sudan.

 

Job Role

  • To prepare & update project monitoring packages i.e. level 3 & 4 schedules, progress measurement system, project reporting systems and invoicing systems etc.
  • Detailed Scheduling of Project activities on Primavera from the given scope of work.
  • To update activities in the overall Level-3 & 4 plan, generate rolling 3 months and 4 weeks look-ahead plans and to keep them updated.
  • Distribution of Manpower to supervisor as per planning
  • Finalization of Equipment, Manpower and Sub-Contractors Deployment              Schedule.
  • S-curves and utilization of other statistical tools.
  • Responsible to analyze schedule status physical progress, man-hours consumption & productivity
  • Analyze overall discipline wise progress and efficiency reports, compare with the targets, and indicate areas where improvements are required.
  • To Assist engineering & procurement disciplines in preparing technical document register & procurement tracking register and provide input as required.
  • To Timely issue of quality project planning deliverables.
  • To Monitor the work in progress with respect to the approved schedules/milestones and prepare weekly/ monthly progress reports.
  • To Review proposals from subcontractors on project execution and schedule.
  • To Keep PCM & Lead planning engineer appraised of the status/ constraints.
  • To Analyze and communicate to the Lead project control engineer/ Project Manager on observation of any instance across disciplines for any major variance between the actual work in progress and the approved schedules.
  • To participate in department development activities for continual improvement in the project control system & services.
  • Preparing the analysis reports  for schedule & cost claims in case of delay

 

Projects with CPECC

  • EPC of Al-Jabalayn Power Plant Extension Project                                                        
  • EPC of Moleeta & Gumry  66 kVA Overhead transmission line  project                     
  • EPC of Al-Jabalayn Central processing facilities (CPF ) extension project                              
  • EPC of Palouge 2 Power Plant  (Engineering Phase only)                                           
  • EPC of Produced Water Reinjection Plant at Palouge                                                  

 

From  May’07-June’07 with DESCON Engineering Abu Dhabi as Planning Engineer

About Company: DESCON Engineering is a Multi-Tasking EPC company in Abu Dhabi, UAE.

 

Job Role

  • Revision of Project Schedule Using Primavera   P3 Planner as per Client  ( Foster Wheeler ) Latest concern for both New & Existing Plant
  • Review & Evaluate Technical proposal for the project which includes Schedules Manpower & Resources.
  • Calculate total Dia Inches of piping for the whole project & total Equipment tonnage includes Heavy lift
  • Review the Dates of Equipment Delivery , Civil Foundation & free issue material to incorporate in the overall final schedule   

 

Projects with DESCON Engineering

  • ENOC Naphtha Hydrotreater Reformer Project

 

 

FromMay’05-Nov’07 with THE AGA KHAN UNIVERSITYPakistan as Assistant Cost Control / Scheduling Engineer

About Company: THE AGA KHAN UNIVERSITYis Medical & Health Education & Services provider in Pakistan

 

Job Role

  • To develop Master Time Schedule for all UMP (Utilities Master Plan) Projects which provide basis to develop progress / cost follow up.
  • To Prepare of monthly Progress reports, forecasts and annual budgets/Cash flow following close liaison with functional managers.
  • Regular strategic review of results and forecasts in conjunction with the Project Manager
  • To Monitoring of project cost & Progress.
  • Progress / Cost follow-up of major works contracts & OFM (owner furnish material).
  • Periodic review/ update Budget/ Forecast to Finish Costs & Cash flows information.
  • To Prepared Progress & Cost status.
  • Reconciliation of expenses between forecast to finish costs, ROP’s(Release of payment) / Finance ledger budget codes / Project(s).
  • To maintain the track of projects contingency by initiating with the help of Project Manager, the project Change Bulletins and incorporating change / Variation orders.
  • Contractors & Consultants billing checking for Cost control part.
  • Preparation of Progress/ Budget variance summery reports

 

Projects with THE AGA KHAN UNIVERSITY

  • Utilities Master Plan I
  • Utilities Master Plan II
  • Utilities Master Plan III

 

FromMar ’04-May’05 with UNICOL LIMITEDas Assistant Planning Engineer

About Company: UNICOL LIMITEDis Sugar and Ethanol Production Company in Pakistan

 

Job Role

  • To monitor coordinate & reports Progress to management during execution work on daily basis.
  • Liaise with all concern engineers and managers in order to formulate a master plan of the project.
  • Establish & develop schedule including procurement schedule
  • Establish & develop a baseline work and monitor progress
  • Liaise with the Project Manager and other concern to establish material procurement schedule.
  • To arrange monthly progress report.
  • To ensure proper and continuous update and safe keeping of data.
  • To provide report on current status at the project and remaining work.
  • Planning & Monitoring of different activities against different cost head
  • To prepare of summery reports
  • To Co-ordinate With Foreign Principal

Projects with UNICOL LIMITED

  • Ethanol Production Plant

 

From April, 2000-Feb, 2004 with INTERGLOBE COMMERCE PAKISTAN LTDas Project Planner

About Company: INTERGLOBE COMMERCE PAKISTAN LTDis repute Construction company in Oil & Gas sector in Pakistan

 

Job Role

  • To preparation of all levels of construction schedule
  • Progress monitoring and control Chart
  • Handled Material Take Off
  • Listing the necessaries (  Man Power, Plant Machinery )
  • Coordination with QA/QC , HSC for preparation and dispatching the reports on daily basis
  • To maintain back up date fore 
  • Planning and Monitoring of different Activities.
  • To collection of information about delay, stoppage in the ongoing activities.
  • To prepare of summery report on daily basis.
  • To control Documentation

 

Projects with Interglobe Limited

  • Oil Storage Tanks Construction & Piping  (WOPP)
  • Oil Storage Tanks Construction & Piping 

MUHAMMAD ZAHID                                          Mobile:+249919509744

E-Mail:zahidarain77@yahoo.com / zahidarain77@gmail.com

 

 Project Management,Planning and Control, Cost & Resource Management, Contract Management 

 

ACADEME

 

B-Tech. (Mechanical)from NED University of Engineering & Technology Karachi in 2002.

 

Other Courses / Trainings:

 

  • Primavera  Project Planner    

            Skill Development Council Karachi

  • MS Project                  

Faith college of Information Technology Hyderabad

 

  • Financial Management for Engineers

NED University of Engineering & Technology Karachi

 

  • Project planning & Control by using Primavera                                           

            Skill Development Council Karachi

 

IT Skills:

Operating System:

DOS, Windows 98, and Windows 2000 Pro, Windows XP

Software Package:

Primavera P3, P5 & P6

MS Project

MS office

  • MS Word,
  • MS Excel,
  •  MS PowerPoint,
  •  MS Access

People soft

Coral DRAW

Photoshop

PERSONAL DOSSIER

 

Date of Birth:11th November 1974

 

Address:  R-130 Salman Garden, Jamia Millia Road  Malir  Karachi

PAKISTAN.

 

Languages Known:English, Urdu, Hindi, Punjabi, Sindhi

 

ACHIEVEMENTS

 

CPECC (Sudan) Outstanding Employee award 2009.

 

PROFESSIONAL SNAPSHOT

  • A keen analyst with over 10 years of experience in Petro chemicals, Oil & Gas, Power and Infrastructure projects.
  • Excellent communication, analytical and problem solving skills
  • Good communication, organizational and time management skills
     Effective motivational, negotiation and interpersonal skills
  •  Good attention to detail
  •  Strong safety awareness
  •  Able to interpret and understand operating and technical processes
  •  Able to prepare and implement effective plans
  • Able to Work under pressure and can deliver within deadline constraints
  •  Highly motivated and with Equipped with good knowledge for Project Control system
  • Strong relationship management, communication skills with the ability to network with Project Members, Consultants, Contractors with consummate ease.
  • Significant experience in Project Planning, Scheduling & cost control.

COMPETENCIES RUN DOWN

  • Preparation & Tracking of the project master schedule and summary level curves and Man power histogram.
  • Generating and updating project monitoring packages schedules, progress measurement system, project reporting systems and invoicing systems etc.
  • Identification, monitoring & streamlining of critical paths running through the Project Master Schedule and individual contracts.
  • Reviewing & Evaluating Technical proposal for the project which includes Schedules Manpower & Resources.
  • Generating of regular Weekly/Monthly reports generation including ‘S’-curves for client & Management
  • Analyzing any major variance between the actual work in progress and the approved schedules.
  • Cost control by Optimization of Resources utilization
  • Understanding project work scope, needs and deliverables, contract milestones
  • Estimating budget quantities, costs, durations and resources.
  • Preparing the analysis reports for schedule & cost claims.
  • Analyzing overall discipline wise progress and efficiency reports, compare with the targets, and indicate areas where improvements are required.
  •  Assisting engineering & procurement disciplines in preparing technical document register & procurement tracking register and provide input as required.

 

 

EMPLOYMENT SCAN

 

Since Nov’07 with China Petroleum Engineering & Construction Corporation, Khartoum, Sudan, as Planning Engineer for Upstream Projects.

About Company: CPECC is an Engineering Procurement & Construction company in Khartoum, Sudan.

 

Job Role

  • To prepare & update project monitoring packages i.e. level 3 & 4 schedules, progress measurement system, project reporting systems and invoicing systems etc.
  • Detailed Scheduling of Project activities on Primavera from the given scope of work.
  • To update activities in the overall Level-3 & 4 plan, generate rolling 3 months and 4 weeks look-ahead plans and to keep them updated.
  • Distribution of Manpower to supervisor as per planning
  • Finalization of Equipment, Manpower and Sub-Contractors Deployment              Schedule.
  • S-curves and utilization of other statistical tools.
  • Responsible to analyze schedule status physical progress, man-hours consumption & productivity
  • Analyze overall discipline wise progress and efficiency reports, compare with the targets, and indicate areas where improvements are required.
  • To Assist engineering & procurement disciplines in preparing technical document register & procurement tracking register and provide input as required.
  • To Timely issue of quality project planning deliverables.
  • To Monitor the work in progress with respect to the approved schedules/milestones and prepare weekly/ monthly progress reports.
  • To Review proposals from subcontractors on project execution and schedule.
  • To Keep PCM & Lead planning engineer appraised of the status/ constraints.
  • To Analyze and communicate to the Lead project control engineer/ Project Manager on observation of any instance across disciplines for any major variance between the actual work in progress and the approved schedules.
  • To participate in department development activities for continual improvement in the project control system & services.
  • Preparing the analysis reports  for schedule & cost claims in case of delay

 

Projects with CPECC

  • EPC of Al-Jabalayn Power Plant Extension Project                                                         (Completed)
  • EPC of Moleeta & Gumry  66 kVA Overhead transmission line  project                      (Completed)
  • EPC of Al-Jabalayn Central processing facilities (CPF ) extension project                               (Completed)
  • EPC of Palouge 2 Power Plant  (Engineering Phase only)                                            (under construction)
  • EPC of Produced Water Reinjection Plant at Palouge                                                    (under construction)

 

From  May’07-June’07 with DESCON Engineering Abu Dhabi as Planning Engineer

About Company: DESCON Engineering is a Multi-Tasking EPC company in Abu Dhabi, UAE.

 

Job Role

  • Revision of Project Schedule Using Primavera   P3 Planner as per Client  ( Foster Wheeler ) Latest concern for both New & Existing Plant
  • Review & Evaluate Technical proposal for the project which includes Schedules Manpower & Resources.
  • Calculate total Dia Inches of piping for the whole project & total Equipment tonnage includes Heavy lift
  • Review the Dates of Equipment Delivery , Civil Foundation & free issue material to incorporate in the overall final schedule   

 

Projects with DESCON Engineering

  • ENOC Naphtha Hydrotreater Reformer Project

 

 

FromMay’05-Nov’07 with THE AGA KHAN UNIVERSITYPakistan as Assistant Cost Control / Scheduling Engineer

About Company: THE AGA KHAN UNIVERSITYis Medical & Health Education & Services provider in Pakistan

 

Job Role

  • To develop Master Time Schedule for all UMP (Utilities Master Plan) Projects which provide basis to develop progress / cost follow up.
  • To Prepare of monthly Progress reports, forecasts and annual budgets/Cash flow following close liaison with functional managers.
  • Regular strategic review of results and forecasts in conjunction with the Project Manager
  • To Monitoring of project cost & Progress.
  • Progress / Cost follow-up of major works contracts & OFM (owner furnish material).
  • Periodic review/ update Budget/ Forecast to Finish Costs & Cash flows information.
  • To Prepared Progress & Cost status.
  • Reconciliation of expenses between forecast to finish costs, ROP’s(Release of payment) / Finance ledger budget codes / Project(s).
  • To maintain the track of projects contingency by initiating with the help of Project Manager, the project Change Bulletins and incorporating change / Variation orders.
  • Contractors & Consultants billing checking for Cost control part.
  • Preparation of Progress/ Budget variance summery reports

 

Projects with THE AGA KHAN UNIVERSITY

  • Utilities Master Plan I
  • Utilities Master Plan II
  • Utilities Master Plan III

 

FromMar ’04-May’05 with UNICOL LIMITEDas Assistant Planning Engineer

About Company: UNICOL LIMITEDis Sugar and Ethanol Production Company in Pakistan

 

Job Role

  • To monitor coordinate & reports Progress to management during execution work on daily basis.
  • Liaise with all concern engineers and managers in order to formulate a master plan of the project.
  • Establish & develop schedule including procurement schedule
  • Establish & develop a baseline work and monitor progress
  • Liaise with the Project Manager and other concern to establish material procurement schedule.
  • To arrange monthly progress report.
  • To ensure proper and continuous update and safe keeping of data.
  • To provide report on current status at the project and remaining work.
  • Planning & Monitoring of different activities against different cost head
  • To prepare of summery reports
  • To Co-ordinate With Foreign Principal

Projects with UNICOL LIMITED

  • Ethanol Production Plant

 

From April, 2000-Feb, 2004 with INTERGLOBE COMMERCE PAKISTAN LTDas Project Planner

About Company: INTERGLOBE COMMERCE PAKISTAN LTDis repute Construction company in Oil & Gas sector in Pakistan

 

Job Role

  • To preparation of all levels of construction schedule
  • Progress monitoring and control Chart
  • Handled Material Take Off
  • Listing the necessaries (  Man Power, Plant Machinery )
  • Coordination with QA/QC , HSC for preparation and dispatching the reports on daily basis
  • To maintain back up date fore 
  • Planning and Monitoring of different Activities.
  • To collection of information about delay, stoppage in the ongoing activities.
  • To prepare of summery report on daily basis.
  • To control Documentation

 

Projects with Interglobe Limited

  • Oil Storage Tanks Construction & Piping  (WOPP)
  • Oil Storage Tanks Construction & Piping 
Professional Since: 
Apr-2000 (25.0 yrs experience)
Oldest experience: 
Oct 2004 (20.5 yrs experience, WARNING: 4.5 years variance with Professional Since)
Years Experience: 
0

Market Place

No results found... (try selecting a different content filter)