Link between Progress and Unit Resource

No replies
Daniel Situmorang
User offline. Last seen 14 years 35 weeks ago. Offline
Joined: 4 Sep 2003
Posts: 9
Groups: None
Hi,
is it possible to break the link between ’% schedule complete’ and ’actual this period units’ for calculating the remaining units & costs of resources, then use the ’% physical complete’ as the driving factor in P5/P6?.
Thanks.

Daniel T. S