RETAINED LOGIC or PROGRESS OVERRIDE

3 replies [Last post]
Ashraf Jahangeer
User offline. Last seen 8 years 6 weeks ago. Offline
Joined: 8 May 2007
Posts: 144
For updating the schedule in general and out-of-sequencework in particular which option for schedule calculation in P3 3.1 is preferable - RETAINED LOGIC or PROGRESS OVERRIDE . What merits/demerits are associated with both these calculation methods?

Replies

Amreshwar Shukla
User offline. Last seen 1 year 5 weeks ago. Offline
Joined: 6 May 2003
Posts: 53
Groups: None
Dear Olike,

There is no way by which u can filter the out-of-sequence activities in P3. But u can look the report generated during the scheduling itself which will inform u about all out-of sequence activites.
If u are more interested u can look other software like Schedule Analyzer.-http://www.ronwinterconsulting.com/sa_main.htm

Regards,
A.S.SHUKLA
Shukla@myrealbox.com
Ife Olyke
User offline. Last seen 9 years 44 weeks ago. Offline
Joined: 6 Feb 2007
Posts: 147
Arvin, that was a very interesting article.

is it possible to filter only out-of-sequence activities?
Arvin Dayday
User offline. Last seen 16 years 12 weeks ago. Offline
Joined: 18 May 2007
Posts: 12
Groups: None
ashraf,

kindly open and read this link.....http://www.pmicos.org/topics/aug2003.asp

regards

arvin