Engineer - Senior Planning, saudi Bin Ladin Group, Makkah Ring Road

START Date: 
January, 2010

 

 

 

PRACTICAL EXPERIENCE:-

 

From January 2013 till now

1-    Employer:  SBG  (Saudi Benladen Group) …..(KSA)                     

Job description:Planning Engineer,

Project :" Makkah First Ring Road(WAQF Station) "

Responsibilities:

As a Planning & Scheduling Engineer

·         Creating project Time Schedule to achieve certain end date

·         Checking and Updating project time schedule (using P6 interprise)

·         Checking site progress for  Weekly update report

                                                                Weekly S-curve update

                                                                Weekly Manpower update

·         Rescheduling main target project to achieve certain end date (by dissolving and extracting activities)

·         Preparing baseline GEPCC (General / Engineering / Procurement / Construction / Commissioning) schedule

·         WBS, sequence of work, manpower, equipment, all resource

 

From August 2008 to December 2012

2-      Employer:  SBG  (Saudi Benladen Group) …..(KSA)                     

Job description:

                                       Planning & Scheduling Engineer,

                                       Material  Engineer

                                       Finishing  Engineer 

 

Project :" King Abdullah University of  Science and Technology "

Projects participated in: Thuwal,80 kilometers (50 miles) north of Jeddah.

Total Area span :more than 362580 m2   

Project main web site:www.kaust.edu.sa

Owner representive:Saudi Aramco

Contractor:SBG(Saudi Binladen Group)

                         Saudi Oger LTD.                                            

Project manegment company:Turner Saudi Arabia

Architect & Lead Designer:Hellmuth,obata+Kassa baum,lp(HOK)          

Contracting Capital:  10 milyar saudi reyal

 

Project consists of   

·         PH1 73residential buildings (distributed among 7 zones) &

                                         08non-residential buildings (civic buildings)

1.Bank

2.Public Library

3.Galleria

4.Goods Transfer Building

5.Waste Transfer Building

6.Theater

7.Yachet club

8.Marine Oceanic Research Center (MORC)

·         PH2    1600  residential villas   ( 1 bed ,2 bed ,3bed  ,&4bedroom)

·         PH3    Coast Guard (HeadQuarters)

                    National Guard (Soliders Residence , Officer Residence , Mussallah)

 

Responsibilities:

As a Planning & Scheduling Engineer

·         Checking and Updating project time schedule (using P6 interprise) for Phase 1 buildings

·         Checking site progress for  Weekly update report

                                                             Weekly S-curve update

                                                             Weekly Manpower update

·         Rescheduling main target project to achieve certain end date (by dissolving and extracting activities)

·         Ability to prepare baseline GEPCC (General / Engineering / Procurement / Construction / Commissioning) schedule

·         WBS, sequence of work, manpower, equipment, all resource

            As a material Engineer

·         Quantity survey for full items of Phase 3 buildings..(excavation, sand backfilling, pc & rc , finishing,…)

·         Tracking the materials from site and stores through revising actual contracts and purchase orders

·         Preparing purchase order for material shown to be missing

·         Reviewing the material request to help in material tracking

·         Modifying shop drawing for subcontractor using AutoCad

·         Working on SAES (Saudi Aramco Engineering standard)

As a finishing Engineer

·         Part of the MCC team (Mechanical Commissioning Certificate)

·         Part of the HOD team (Handing Over Department)

·         Closing EIL items (Exception Item List)

 

KAUST is being registered with the USGBC  for LEED certification and is considered a Green Building

 

 

 

 

 

 

 

 

 

 

 

From January 2006 to Augest 2008

3-      Employer: DCG (design construction group) ….(Egypt)

Job description:    

                                    Project Engineer

                                    Planning Engineer,

                                    Procurement Engineer,

                                    Quantity Survey Engineer,

                                    Quality Control Engineer

Projects :-

1.       Multi Storage Gamaloons for one the biggest loading and exporting companies (SESCOTRANS) all over Alexandria,Domyat and Suez

2.       4 residential Villas in  Mirrage city resort at  Katameya(4000 m2)

Responsabilities

·         Prepairng the  pep (project execution plan) which provides an overall plan for the implementation and execution of the work through completion of the project

·         Design simple sections required for site issues

·         checking all civil work  and construction

·         checking all civil drawing and site shopdrawings

·         Following up project time schedule using P3 (Primavera Project Planning)

·         Checking site progress for weekly update report

                                                            weekly S-curve update

                                                            weekly Manpower update

·         Modifying shop drawing using AutoCad

·         Working with coordination between contractor, design consultant and client

·         Calculating and listing the material needed for site issues and purchasing them from local market and suppliers

·         QC  on readymix concrete

·         Achieving conrete lab tests for pressure resistance

 

 

From January 2003 to January 2006

4-      Employer: ACE (Arab consultant Engineers)….  (Egypt)

Job description:    

                                  Survey Engineer ,

                                  QC/QA (Quality Control/assurance)

                          

AtOne of the biggest Industrial projects at Middle East

(  Abu Zaabal Steel Rolling Factory   )

 

"The project is built on 50 Feddans (750x280m), its space has been expanded to 260 Feddans in Abu Zaabal area, left side from Cairo-Belbis desert road, Kilo34.

 

 

 

The project consists of :

·         Main building,

·         Services buildings such as:

                                                                                                         i.            Control rooms,

                                                                                                       ii.            Electricity plant,

                                                                                                      iii.            Water tanks,

                                                                                                     iv.            Water purification plant .

·         Administrative building,

·         Maintenance workshops,

·         Stores,

·         Laboratory,...etc.

The project entries had been connected through asphalat & concrete access roads & a whole wall.
The project objective is: rolling & producing of steel iron: cold & hot.

The contract valueis 316 million L.E. (max.)

Project period: 41 months (max.)"

Contractor:Arab Contractors (AC) (Usman Ahmed Usman)

   Technical Companies :SMS Group

(SMS SIEMAG, Siemens, LOI, Fulguara, and Herquline Companies ) 

    Consultant :  Arab consultant engineers ( ACE ) ( Muhharm Bakhoom )

Contracting Capital:-187,051,678 LE  divided to

·   AC    122,338,094  LE (arab contractor)

·   DSD  64,713,584    LE (ferrometalico)

 

Responsibilities: Checking all civil and survey work in site ….

·           Industrial project

·           Heavy Machine Foundation including embedded parts.

·           Steel structure foundation

·           Water tanks slipform & heavy lifting ( Lift slab Misr )

·           High water tank which provides 60 psi (pound per square inch ) at the base of the tank with 42 m high

·           Pile Works

1.       End bearing piles

2.       Displacement piles

3.       Replacement piles : the hole is done by a drill and filled with in-situ concrete

4.       Sheet piles which are used in deep excavation

·           Office building

·           Fence &VIP gate

 

Including:

·           Following up project time schedule

·           QC on ready concrete mix

·           Rechecking shopdrawings

·           Calculating and reviewing quantity survey

 

 

Experience Hours (Planning & Scheduling): 
16050