Construction Site Superintendent (Paving & Drainage), Bechtel - ENKA Joint Venture, Bechtel & Enka Joint Venture-Albania Motorway Project

START Date: 
April, 2007
END Date: 
August, 2009
Project was executed by U.S based Bechtel Co. Inc. ( www.bechtel.com )and Turkey based Enka Co.Inc. ( www.enka.com )partnership valued at 750 million Euros (€). Managed motorway Paving and Drainage works (Drainage Pipes Installation, Manhole Installation, Sub-base, Asphalt, and Drainage Channels) with 140 personnel (Foreman, Labor, Operators and Truck Drivers) and 45 pieces of equipment (Backhoe Loaders, Asphalt Pavers, Concrete Pavers, Rollers, Graders, Trucks and Tractors) on site and made sure that the scope of work was executed on time and within the budget. Worked closely with support departments such as Quality Control, Survey, Design, and Equipment & Quarry/Plant Department to get the work completed on schedule.

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.