START Date: 
May, 2007
END Date: 
November, 2008
•     To provide project schedule as per the requirement on TOR for proposal submission
•     To develop detailed project plan and schedule
•     To provide progress measurement and report on weekly basis
•     To provide updated schedule and two week look ahead on weekly basis
•     To provide forecast schedule and delay analysis
•     To attend project meeting
•     To provide project S-curve and manpower loading schedule
•     To provide project report to project manager / project engineer
•     To provide time impact analysis due to change order / additional scope

     Project Reference and Client:
     LKU-E Dehydration Detailed: PTTEP SIAM LIMITED
     LKU-F Dehydration Detailed: PTTEP SIAM LIMITED
     MOC Cracking Furnace: SCG
     Quick Development of Additional Power Generator: PTTEP SIAM LIMITED
     Tantawan Expansion FEED Phase: COTL
     Benchamas Fire Protection System Upgrade: COTL
     Communication tower FEED Phase: COTL
     New LPG & Flare Header Project: Thai Oil
     S1 Power System Expansion Upgrade Detailed Design: PTTEP SIAM LIMITED
     CO2 Reinjection study: PTTEP
     Bongkot Phase 4A: PTTEP
     BG Hydra Project PK & SWP Wellhead Platforms: CUEL
     Satun Produced Water Injection Detailed Design: CTEP
     CPOC JDA Block B-17 Field Development: Ramunia