Foster Wheeler Planner

START Date: 
September, 2005
END Date: 
April, 2006
PETRORabigh
Rabigh Development Utilities and Offsite Umbrella (EPCm)
Reading, UK
     Integrated refining and petrochemicals complex Facilities expansion include Buildings, all interconnecting pipe ways, approximately 1600 interfaces, piping, flare system, New main central control room, revamp of existing control room, fuel oil & gas distribution networks, waste water collection systems, permanent roads, conversion of existing Tankage, blending & metering system, chemical storage system, modification of product export facility, 8 new substations, 1,280km of cable underground electrical and general field instruments. 10 million man-hours plus direct labour; construction Site based at existing Rabigh refinery on the west cost of Saudi Arabia.

Initially based in Reading at the start of Engineering phase to establishing and supervise the population of the project Document System (WebDMS) and progress measurement system, coordinating between FW IEC and Reading offices.

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.