Agip KCO Project Controls Engineer
START Date:
February, 1990 Name: VISSAPRAGADA KRISHNA MOHAN
Current Position: Sr. Project Controls Engineer
Nationality: Indian
Date of Birth: 15th August, 1967
Education: - B.Tech, Civil, 1990
Nagarjuna University, Guntur, India
- MBA in Project Management,
Indian School of Business Management, PUNE
- Currently doing PG Diploma in 6 Sigma Black Belt
(Correspondence)
Computer literacy: Primavera3.1/P6.1, Good introduction to Primavera Expedition and Kildrummy Cost Manager.
Professional Affiliation: Member of IEI (Institute of Engineers India)
Kuwait Chapter, 2003
Job Understanding:
Coordinate and discuss the cost categories and budget and resource allocations for the contract with the Project execution team and tendering team.
Monitor requirements of budget adjustments and reallocations.
Preparation of high level cost status and criticality and project trend reports based on CPI and SPI.
Monitor archiving and project closeout documentation and compilation of final dossiers and historical reports.
Develop, Maintain and update the productivity matrices from the actual values reported during the project period useful as a guiding factor for future tendering.
Discuss SOW with project team and guide the planning engineers on preparation of Project execution plan and master logic for the schedules. Monitoring the preparation of Level 1, 2 and 3 Project schedules and Progress Measurement Systems with relevant work break down and cost break down structures as per contractual requirements.
Attending meeting with the Client’s & Subcontractor’s counter parts and follow-up with the project requirements for both Client’s and the Company for reporting and invoicing project progress against agreed upon KPIs..
Guiding preparation of Earned Value and Variance reports both on physical and financial aspects of the project on weekly and monthly basis. Follow-up on Critical activity and float analysis reports periodically.
Monitor Resource pooling and allocation and reallocation requirements of resources and sub-contract controls.
Monitor preparation and follow-up of invoicing schedules and variation order logs.
Update personal knowledge to keep pace with the day to day changing technology.
Professional Experience:
M/s. Agip KCO,.
[July, 2008 – Till Date] Sr. Project Controls Engineer - 4W/4W Rotation
• Kashagan Field Development in North Caspian Sea
Atyrau, Kazakhstan.
Value of the Project: Expected 135 Billion US Dollars
M/s. Petrofac International Ltd.
[Nov, 2006 – Jun 2008] Sr. Project Controls Engineer - 8W/3W Rotation
• GPIUP - Gas Plant Integrity Upgrade Project.
Name of Client: CJSC Rospan International
Value of the Project: US$ 88 Million
M/s. National Company for Electrical and Mechanical Works,
(Kharafi National) Kuwait
[Sep, 2003 - Nov, 2006] Sr. Planning & Cost Control Engineer
• Construction of Sea Water Cooling Towers for Olefins-2 Project with Equate Petrochemicals.
Value of the Project: US$ 55 Million
• Design Development, Procurement & Construction of all Electro-mechanical works TAMDEEN Shopping Centre for 360o Project, a six storied building with a built-up area of Hundred and Sixty Thousand Square meters per floor, consisting 0f 16 Nos. of Cinema theatres, Shopping malls and other facilities for TAMDEEN Shopping Centre Development Company.
• Design Development, procurement & Construction of Auxiliary services for Customs Canine & Administration buildings at Sulaibiya, Shuaiba, Salmi & Nuwaiseeb.
• Design, Procurement and Construction & Renovation of CFLCC Various projects, Camp Virginia.
• Design, Procurement and Construction & Renovation of Camp Arifjan Buildings 5&6,Buildings C,E,F,G&H
• Renovation works & New Extension of Building 200 at American Army base in Kuwait, Sub Contracting with Washington International Inc;
• Old and New SIEF Palace Rehabilitation & Refurbishment Works Under the Governance of Amiri Diwan and Council of Ministers
M/s. United Gulf Constructions Co W.L.L, Kuwait.
[May, 2002 - Sep, 2002] Sr. Planning & Cost Control Engineer
• Design, Procurement and Construction of Ahmadi ‘Water and Gas ‘Networks under the governance of M/s Kuwait Oil Company (K S C).Providing 450Kms. of Fresh Water, Brackish Water, Chilled Water, Treated water & Gas Pipe lines for the Kuwait Oil Company North Ahmedi township Domestic & Commercial Areas.
M/s. Diana Projects & Engineers Ltd, Hyderabad, India
[May, 1998 - April, 2002] Construction manager
• Construction of a software complex of 360,000 Square Feet for M/s SSI Ltd.at Chennai. Construction of hotel (210 Rooms) Green park at Chennai.
• Worked in the National High way No. 5 construction work including all drainage, water supply and other services, Gummidi Pundi, Tamil Nadu, INDIA.
[Sep, 1995 - April, 1998] Project Engineer (Civil)
• Work includes offshore & onshore crude oil pipe line
for 8KMs in sea and 5KMs on land until the tank pads, with M/s. ‘Hyundai Heavy Industries” (Korea) and ‘Command Petroleum’ (Australia) & M/s Punjlloyd Limited.
• Worked in the Industrial Building construction work of M/s. Cheminor Drugs LTD., Pydibhimavaram, SRIKAKULAM, INDIA.
• Work includes an effluent treatment plant, anaerobic filters, laboratory and an effluent disposal pipe line for 11KMs. on land and 2Kms. in the Sea. Chemical solvent pipe lines from the solvent yards to the reactors in the production blocks Construction of Pharma & Drier buildings, Distillation columns and Incineration units.
• Worked in the National High way No. 5 construction work including all drainage, water supply and other services, Gummidi Pundi, Tamil Nadu, INDIA.
M/s J. S. R. Constructions Pvt. Ltd. Gujarat, India
[Dec, 1994 - Aug, 1995] Project Engineer (Civil)
• Construction of Khari Canal Siphon situated at NPMC220 Km
[Nov, 1992- Nov, 1994] Sr. Site Engineer (Civil)
• Cement Concrete lining and Construction of village road bridges and cross regulators, Field Surveying, Quantity Survey, Tendering for the project of Luwara And Dora Branch Canals, Sardar Sarovar Narmada Nigam Ltd, Gujarat.
[Feb, 1990- Oct, 1992] Site Engineer (Civil)
• Narmada Main Canal Excavation , Concrete Lining, Construction Village Road Bridges and cross regulators from CH.50 Km to 58.65 Km.
PERSONAL DETAILS:
Date of Birth :15thAug.1967 Age : 42Years Passport No : G7499843
Nationality : Indian
PERMANENT ADDRES: V.KRISHNAMOHAN,
House No.11-3-169/1, Road. No .11,
Venkateswara Colony, Saroor Nagar, Hyderabad,
Andhra Pradesh,
INDIA-534001,
Telephone: +91-40 -24055617, +91-8812-240394, +91-8812-249538
Mobile Phone: India - +91 – 98668 25632
Kazakhstan - +7 – 70199 76132
Thanks & Best Regards,
Mohan V K
Current Position: Sr. Project Controls Engineer
Nationality: Indian
Date of Birth: 15th August, 1967
Education: - B.Tech, Civil, 1990
Nagarjuna University, Guntur, India
- MBA in Project Management,
Indian School of Business Management, PUNE
- Currently doing PG Diploma in 6 Sigma Black Belt
(Correspondence)
Computer literacy: Primavera3.1/P6.1, Good introduction to Primavera Expedition and Kildrummy Cost Manager.
Professional Affiliation: Member of IEI (Institute of Engineers India)
Kuwait Chapter, 2003
Job Understanding:
Coordinate and discuss the cost categories and budget and resource allocations for the contract with the Project execution team and tendering team.
Monitor requirements of budget adjustments and reallocations.
Preparation of high level cost status and criticality and project trend reports based on CPI and SPI.
Monitor archiving and project closeout documentation and compilation of final dossiers and historical reports.
Develop, Maintain and update the productivity matrices from the actual values reported during the project period useful as a guiding factor for future tendering.
Discuss SOW with project team and guide the planning engineers on preparation of Project execution plan and master logic for the schedules. Monitoring the preparation of Level 1, 2 and 3 Project schedules and Progress Measurement Systems with relevant work break down and cost break down structures as per contractual requirements.
Attending meeting with the Client’s & Subcontractor’s counter parts and follow-up with the project requirements for both Client’s and the Company for reporting and invoicing project progress against agreed upon KPIs..
Guiding preparation of Earned Value and Variance reports both on physical and financial aspects of the project on weekly and monthly basis. Follow-up on Critical activity and float analysis reports periodically.
Monitor Resource pooling and allocation and reallocation requirements of resources and sub-contract controls.
Monitor preparation and follow-up of invoicing schedules and variation order logs.
Update personal knowledge to keep pace with the day to day changing technology.
Professional Experience:
M/s. Agip KCO,.
[July, 2008 – Till Date] Sr. Project Controls Engineer - 4W/4W Rotation
• Kashagan Field Development in North Caspian Sea
Atyrau, Kazakhstan.
Value of the Project: Expected 135 Billion US Dollars
M/s. Petrofac International Ltd.
[Nov, 2006 – Jun 2008] Sr. Project Controls Engineer - 8W/3W Rotation
• GPIUP - Gas Plant Integrity Upgrade Project.
Name of Client: CJSC Rospan International
Value of the Project: US$ 88 Million
M/s. National Company for Electrical and Mechanical Works,
(Kharafi National) Kuwait
[Sep, 2003 - Nov, 2006] Sr. Planning & Cost Control Engineer
• Construction of Sea Water Cooling Towers for Olefins-2 Project with Equate Petrochemicals.
Value of the Project: US$ 55 Million
• Design Development, Procurement & Construction of all Electro-mechanical works TAMDEEN Shopping Centre for 360o Project, a six storied building with a built-up area of Hundred and Sixty Thousand Square meters per floor, consisting 0f 16 Nos. of Cinema theatres, Shopping malls and other facilities for TAMDEEN Shopping Centre Development Company.
• Design Development, procurement & Construction of Auxiliary services for Customs Canine & Administration buildings at Sulaibiya, Shuaiba, Salmi & Nuwaiseeb.
• Design, Procurement and Construction & Renovation of CFLCC Various projects, Camp Virginia.
• Design, Procurement and Construction & Renovation of Camp Arifjan Buildings 5&6,Buildings C,E,F,G&H
• Renovation works & New Extension of Building 200 at American Army base in Kuwait, Sub Contracting with Washington International Inc;
• Old and New SIEF Palace Rehabilitation & Refurbishment Works Under the Governance of Amiri Diwan and Council of Ministers
M/s. United Gulf Constructions Co W.L.L, Kuwait.
[May, 2002 - Sep, 2002] Sr. Planning & Cost Control Engineer
• Design, Procurement and Construction of Ahmadi ‘Water and Gas ‘Networks under the governance of M/s Kuwait Oil Company (K S C).Providing 450Kms. of Fresh Water, Brackish Water, Chilled Water, Treated water & Gas Pipe lines for the Kuwait Oil Company North Ahmedi township Domestic & Commercial Areas.
M/s. Diana Projects & Engineers Ltd, Hyderabad, India
[May, 1998 - April, 2002] Construction manager
• Construction of a software complex of 360,000 Square Feet for M/s SSI Ltd.at Chennai. Construction of hotel (210 Rooms) Green park at Chennai.
• Worked in the National High way No. 5 construction work including all drainage, water supply and other services, Gummidi Pundi, Tamil Nadu, INDIA.
[Sep, 1995 - April, 1998] Project Engineer (Civil)
• Work includes offshore & onshore crude oil pipe line
for 8KMs in sea and 5KMs on land until the tank pads, with M/s. ‘Hyundai Heavy Industries” (Korea) and ‘Command Petroleum’ (Australia) & M/s Punjlloyd Limited.
• Worked in the Industrial Building construction work of M/s. Cheminor Drugs LTD., Pydibhimavaram, SRIKAKULAM, INDIA.
• Work includes an effluent treatment plant, anaerobic filters, laboratory and an effluent disposal pipe line for 11KMs. on land and 2Kms. in the Sea. Chemical solvent pipe lines from the solvent yards to the reactors in the production blocks Construction of Pharma & Drier buildings, Distillation columns and Incineration units.
• Worked in the National High way No. 5 construction work including all drainage, water supply and other services, Gummidi Pundi, Tamil Nadu, INDIA.
M/s J. S. R. Constructions Pvt. Ltd. Gujarat, India
[Dec, 1994 - Aug, 1995] Project Engineer (Civil)
• Construction of Khari Canal Siphon situated at NPMC220 Km
[Nov, 1992- Nov, 1994] Sr. Site Engineer (Civil)
• Cement Concrete lining and Construction of village road bridges and cross regulators, Field Surveying, Quantity Survey, Tendering for the project of Luwara And Dora Branch Canals, Sardar Sarovar Narmada Nigam Ltd, Gujarat.
[Feb, 1990- Oct, 1992] Site Engineer (Civil)
• Narmada Main Canal Excavation , Concrete Lining, Construction Village Road Bridges and cross regulators from CH.50 Km to 58.65 Km.
PERSONAL DETAILS:
Date of Birth :15thAug.1967 Age : 42Years Passport No : G7499843
Nationality : Indian
PERMANENT ADDRES: V.KRISHNAMOHAN,
House No.11-3-169/1, Road. No .11,
Venkateswara Colony, Saroor Nagar, Hyderabad,
Andhra Pradesh,
INDIA-534001,
Telephone: +91-40 -24055617, +91-8812-240394, +91-8812-249538
Mobile Phone: India - +91 – 98668 25632
Kazakhstan - +7 – 70199 76132
Thanks & Best Regards,
Mohan V K
- Company:
- Industry:
- Region: