Birse Metro Senior Planner
START Date:
November, 2006
END Date:
February, 2009 • NEC Contract and subcontractor resource management.
• Develop multi-discipline (Premises, Mechanical, Electrical, and Communications) programme based on RIBA design / Scope Documentation.
• Ensure programmes meet NEC3 Engineering and Construction Contract specifications.
• Site based progress management.
• Work package costing, resourcing, schedule implementation and analysis.
• Commercial system and programme implementation development.
• Integrating programmes into P3e, within the enterprise WBS structure.
• Earned Value Control, Critical Path Analysis and Periodic Progress Reporting to directorship.
• Periodic Lockdown and MPD preparation.
• Snagging, closeout and preparation of final documentation.
• Develop multi-discipline (Premises, Mechanical, Electrical, and Communications) programme based on RIBA design / Scope Documentation.
• Ensure programmes meet NEC3 Engineering and Construction Contract specifications.
• Site based progress management.
• Work package costing, resourcing, schedule implementation and analysis.
• Commercial system and programme implementation development.
• Integrating programmes into P3e, within the enterprise WBS structure.
• Earned Value Control, Critical Path Analysis and Periodic Progress Reporting to directorship.
• Periodic Lockdown and MPD preparation.
• Snagging, closeout and preparation of final documentation.