DiA Holding FZCO Planner

START Date: 
August, 2007
END Date: 
December, 2009
Worked as a planning engineer in Heydar Aliyev Centre, an iconic building designed by award winning architect Zaha Hadid in Baku, Azerbaijan. Prepared work schedules in different phases of project with different work sequencing and material quantities, loaded resources and got resource loading reports from the work schedule by using Primavera Project Planner 3.1 (P3.1), Primavera 6.0 (P6) and Microsoft Project (Ms Project) computer software. Defined schedule activities at the lowest level in the work breakdown structure (WBS). Identified the logical relationships among schedule activities. Set schedule activity resources (persons, equipment, or material) and estimated quantities of each resource would be used. Estimated durations of activities by considering information on activity scope, required resource types, resource quantities and resource calendars with resource availabilities. Prepared the necessary system to monitor the production of site with daily, weekly and monthly reports. Compared these productions with planned (target) values, prepared performance reports periodically. Developed and worked in a system so that technical office can use same database for updating quantity take-off, preparing progress reports, preparing and monitoring work schedules and budgets, also preparing interim payments of subcontractor and contractors.

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.