Limak construction CO Senior Planner

START Date: 
March, 2004
END Date: 
January, 2005
Project:
Emergency rehabilitation of Kabul - Salang - Doshi Road project, (Section 2, Olang - Doshi section), including bridges and tunnels, Total 75 km, 2 lane highway re-design, and construction activities. Total $29.6 M. USAID funded, supervised by Louis Berger Group of USA as a consultant.

Responsibilities: (Reporting to Project Manager)
•     Preparing daily, monthly progress reports,
•     Preparing progress certificates and submitting to consultant,
•     Coordinating the procurement activities,
•     Controlling subcontractors progress certificates,
•     Planning necessary man power, materials, machineries and equipments,
•     Preparation and updating the construction Schedule, dynamic scheduling,
•     Participating into progress meetings,
•     Slippage reporting and taking necessary measures to complete the work on time.
•     Solving the technical problems with the management & with the supervisor,
•     Monitoring the Material tests,
•     Preparing the required procedures,
•     Preparing the claims according to FIDIC,
•     Reviewing EOT claims and related Cost claims,
•     Preparing counter arguments against engineers` claims,
•     Developing strategies for substantiating EoT and cost claims through contractual and technical arguments,
•     Coordinating issues with consultant for solving any dispute in quantities,
•     Evaluating Variation Orders,
•     Evaluating final quantities,
•     Participating in negotiations with the Engineer concerning EoT and cost,
•     Contract administration,
•     Following-up the amendments,
•     Outgoing and incoming letter management,
•     Controlling of the shop drawings, (and other Document Controlling activities),
•     Controlling the asphalt plant productivity,
•     Performing Rate analysis for the new items,
•     Sifting and compiling contemporary records constituting evidence for the claimed time and cost.