Stansted Generation 2

Engineer, Faber Maunsell AECOM, BAA, Stansted Generation 2, Surface Access Studies

START Date: 
July, 2004
END Date: 
August, 2005

I gathered and analysed M11 bridge Inspection and Assessment reports from two Maintenance Area Contractors (MAC)s leading to production of an Existing Structures Report. I arranged access to the Highways Agency SMIS database. I investigated the appointment of a laser scanning survey specialist to undertake survey of structures with critical tolerances.