4D Planning Consultant update base line schedule review, Vanoord Gulf FZE, Dredging and Reclamation

START Date: 
August, 2013
                                                            

 

 

GODINEZ, DANIEL S.

  Home Address:

2/F-A, 87 Praya Street

Cheung Chau,

Hong Kong SAR

Mobile:  +971 569004849

E-mail:  dsg0712@gmail.com

Citizenship Status: (Hong Kong National) Filipino

 

Planning Experience:

Planning Engineer

Jumana Island – Dubai UAE

Vanoord Middle East FZE

Dubai, U.A.E.

July 2013 – present

 

Snr. Project Planner

Upper Zakum Artificial Islands

National Marine Dredging Company

Musafah, Abu Dhabi, U.A.E.

May 2010 – Jan 2011

 

Planning Engineer

Khalifa Port and Industrial Zone Project

Boskalis Westminster Middle East

Al Taweela, Abu Dhabi, U.A.E.

Dec 2009 – Feb 2010

 

Project Planner

Dredging International South Africa

DurbanHarbourWidening and Deepening Project,

Durban, South Africa Aug 08 - Jul 09

 

Jan De Nul Dredging - Boskalis Westminster Middle East

Dredging, Land Reclamation and

Construction of Breakwater for

Ras Laffan Port Expansion Project

01 June 06 – 31 May 08

 RasLaffan PortExpansion Project, State of Qatar

 Project Planner

Responsibilities: Project planning and programming and provided direct scheduling support to projects to include: Project planning, master schedules, detail schedules, interdependency and network schedules. Facilitate and assist programs in establishing schedule by defining the tasks, establishing logical relationships, estimating appropriate duration, identifying necessary constraints, assigning appropriate resources, and analyzing the schedule. Provide schedule analysis to include float analysis/slack and critical path status at the summary level (Gantt charts, Milestone/Events, Master Phasing Schedule) in addition to detailed task level. Directly responsible for 'hands-on' scheduling support to control account managers by developing new schedules for work in planning stages, updating schedules as revisions occur, and updating status all schedules on a weekly basis. Facilitate and assist programs in developing Integrated Master Plans.

 

Boskalis Westminster - Archirodon

Artificial Island and Underwater Berm, North Caspian Sea Project

Republicof Kazakhstan

Feb 05 – July 05

 

Project Planner

Project: Construction of US$ 80M Artificial Island and underwater berm at North Caspian Sea Project Kazakhstan ROK.

Responsibilities: Project planning and programming and provided direct scheduling support to projects to include: Program plans, master schedules, detail schedules, interdependency and network schedules. Facilitate and assist programs in establishing schedule by defining the tasks, establishing logical relationships, estimating appropriate duration, identifying necessary constraints, assigning appropriate resources, and analyzing the schedule. Provide schedule analysis to

Artificial Island and Underwater Berm at North Caspian Sea

 

Project Planning for:

AIM Group Limited

Period: Sept 99 – July 02

 KCRC East Rail Extension - Necso-China State-Hip Hing Joint Venture.

 Responsible for the submission of the revised Master Works programme TCC200/300 and Detail Construction programme for all Stations and Viaduct construction from Tai Wai to Lee On. Prepared the initial programme for Piling and Structural, mechanical, electrical and ABWF works utilizing Primavera Project Planner 3.0, Microsoft Project and MS Excel.

 

 China Light & Power/ Yau Nam Kee Contractors-

Responsible for the preparation of the Initial Submission programme for the Power Cable circuit Installation from Tai Wan to Tseung Kwan O.

Contract DC/96/17 Strategic Sewage Disposal Scheme Paul Y. - Seli(JV) Completion works for Transfer SystemResponsible for the preparation of Detailed Construction Programme which included completion works for the Tunnel Shafts at Chai Wan Kwun Tong, Tseung Kwan O, Shau Kei Wan, and Shau Kei Wan Diversion Chamber and 5 nos. sections of Surface works which included steel pipework, civil works, E&M and general landscaping.

Assisted in the preparation of a works method statement for each shaft / surface works area detailing the logic, sequence and resources required for the monitoring and production of ‘S’ curve schedules.

 

 MTRC 602 Tiu Keng Leng Station, N.T. Hong Kong

Paul Y. -CRECJV.

Project Planner - Responsible for the initial submission of detailed construction programme for Grid Line 7-2, TKL Station terminal. Preparation of alternative construction programmme as part of the Delay Recovery Measures.

 

Planning and Programming experience for KCRC West Rail Extension under ChunWo-Fujita-Henry Vicy. Responsible for the monthly update and submission of the Master Works programme and preparation of the monthly progress report for earthworks, structural, mechanical and ABWF installation works.

 

 

<?xml:namespace prefix = st1 />WORK HISTORY:

 

Period            June 2011 – present ( Temp Job)

Company      Artlink Design Associates Ltd.

Position       Designer / Project Manager

 

 

 

Period            May 2010 – Jan 2011

Company      National Marine Dredging Co.

Musafah Road, Abu Dhabi, U.A.E.

Position       Snr. Project Planner

 

 

Period            Dec 2009 – Feb 2010

Company      KhalifaPortand Industrial Zone Project

Boskalis Westminster Middle East

Al Taweela, Abu Dhabi, U.A.E.

Position       Planning Engineer

 

 

 

 

 

Period            Aug 2008-Jul 2009

Company      Dredging International South Africa Pty.
Durban Harbour Widening and Deepening Project

                        Durban, South Africa

Position       Project Planner

 

 

Period            Jun 2006-May 2008  

Company      Jan De Nul Dredging - Boskalis Westminster Middle East
Dredging, Land Reclamation and Construction of Breakwater for RasLaffan Port Expansion

 

Position       Planning Engineer 

Period         Jan 2005– Jul 2005

Company     Boskalis Westminster-Archirodon

Position         PlanningEngineer

 

Period         2004 – 2005

Company     Artlink Design Associates Ltd.

Position         Project Manager / Designer

Responsible for design documentation and project management responsibilities. Frequent travel to China for project construction interface with consultants and contractors.

 

Period         Jan 2003 – Oct 2003

Company     Goudie Associates Ltd.

Position         Project Supervisor / Designer

 

Responsible for design documentation and project management responsibilities.

 

Period         2002 – 2003

Company     Prudential Surveyors Ltd.

Position         Cad Manager

 

Period         1999 – 2001

Company     AIM Group Project Management

Position         Project Planner

 

Position      Project Designer

Period         Mar 1999 – Sep 1999

Company     TKL Lighting Consultants

ResponsibilityProject development team member responsible for lighting design for commercial, private residential, and corporate offices. Exterior lightscaping for leisure facilities. Responsible for planning and preparation of working drawings using CAD.

 

Period         July 1997 – Jan 1999

Company     John Lei Architects

Position      Architect/Project coordinator

ResponsibilityResponsible for project design development, space planning and interior design. Responsible for the preparation of architectural and structural working drawings, and project presentation using AutoCAD and 3D design software as well as freehand sketches. Involved in various projects for commercial, residential, and industrial complex.

 

Period:        Jan 1997 – Jul 1997

Company:    Seedtron Development Consultants

Position:     Project Planner / Architect

Responsibility:Responsible for the preparation of architectural and interior design working drawings for project presentation using CAD software. Project coordination with various contractors and consultants.

 

Period         May 1993 – Dec 1996

Company     Richard Tin Associates

Position      Architect/Project Coordinator

Responsibility:Responsible for project design concept development, space planning and interior design. Responsible for the preparation of architectural and structural working drawings. Project presentation using CAD design software. Traveled to China and involved in various projects for commercial, residential, and industrial complex.

 

COMPUTER SKILLS

 Primavera ver. 8.2

 

LANGUAGE        

Spoken English – fluent                

Written English - fluent

Cantonese – 30%

         

 

EDUCATION               

 Year:                     1989

Qualification:            University

School:                 Central University of the Philippines

Discipline:                Architecture / Civil Engineering

 