Assistant / Planning Engineer, Koh Brothers Building and Engineering, Changi Airport Terminal 5 Runway

START Date: 
January, 2015

Company: Koh Brothers Building & Civil Engineering Contractor Pte. Ltd(July 2015 –Present)

Project:

-          Koh Brothers Joint Venture - Changi Airport Runway 3 P1:Proposed Development of Changi East to Effect 3 Runway Operation at Singapore Changi Airport Package 1

-          Parc Olympia:Proposed New Erection Of a Condominium Housing Development Comprising 2 Blocks of 7-Storey, 2 Blocks of 8-Storey and 4 Blocks Of 9-Storey Residential Building With Basement Car parks, Swimming Pools and Communal Facilities on LOT 4772L MK31 At Flora Drive 

 Position:

-          Planning Engineer

·         Analyzes drawings, specifications and statements of work in the preparation of activity networks for project resource planning and scheduling.

·         Preparation of program master schedule and perform critical path analysis.

·         Updating program master schedule on a regular basis for project management reporting

·         Prepare Look Ahead Schedules

·         Coordinate with Resource Coordinator for manpower & equipment requirements and overall coordination to ensure optimum utilization of resources.

·         Maintains liaison with the project and field personnel for schedule revisions and updates.

·         Identify the critical path of the project and coordinate with project managers, construction managers and discipline engineers to ensure that all activities falling on the critical path are completed on time so as not to delay the project

·         To monitor the progress of work against the baseline schedule and preparation of weekly and monthly client and management reports.

·         Participates in coordinating with architecture/engineering firms in developing design criteria and preparing layout and detailed drawings, prepares bid sheet and contracts for construction and facilities acquisitions

 

 

 

 

 

Company: Greatearth Construction Pte. Ltd. (March 2014 –July 2015)

Project:

-          The Crest:Proposed Condominium Development Comprising of 4 Blocks of 5-Storey and 3 Blocks of 23-Storey Residential Buildings (Total: 469 units) with Basement Car parks, swimming pool, Clubhouse, Tennis Court, Landscape Deck and Communal Facilities on Lot 02268M TS 24 at Prince Charles Crescent, Singapore

   Position:

-          Planning Engineer

·         Responsible in Baseline Schedule, Tender Schedule, Recovery Schedule and On – Going Schedule

·         Updating Schedule

·         Reporting (Daily, Bi-Weekly Progress)

·         Analyzing and Developing Method and Sequencing Construction Activities

·         2 weeks Look Ahead

·         Executive Report

·         Procurement Planning

·         Projected Cash Flow and Projected Manpower Chart

 

Company: Al-Bassami Group (January 2012 – January 2014)

Projects:

-          TalahGarden City Phase 1-Infrastructure (EMAAR – King Abdullah Economic City, Saudi Arabia)

-          Alfareeda Residential Community Project Zone 1, 2, 3 and 4 – Infrastructure (Dhaban, Saudi Arabia)

-          GovernmentOffice Building in Al Lith and Adom, Saudi Arabia

-          Roads and Shore Development in Al Shawaq, Saudi Arabia

-          Infrastructure in Yanbu, Saudi Arabia

-          Infrastructure in Al Madina, Saudi Arabia

-          Infrastructure in Salman Bay Project, Saudi Arabia

   Position:

-          Planning Engineer

·         Responsible in Baseline Schedule, Tender Schedule and On – Going Schedule

·         Design, Shop Drawing, Procurement, Manpower and Equipment Plan

·         Cash Flow (In flow and Out Flow)

·         Analyzing and Developing Method and Sequencing Construction Activities

·         Daily Report / Weekly Report / Monthly Report

·         2 weeks Look Ahead and Monthly Look Ahead

·         Recovery/Revise Plan

·         Updating the Schedule

 

 

-          Technical Head

·         Compiling of All Report to all Projects

·         Approval of Quantity Delivered in Site

·         Summary of Progress in all Projects

·         Data Gathering in all Project

 

 

Company: MGS Construction (September 2008January 2012)

Projects:

-          Starmall Bulacan(San JoseDelMonte, Bulacan )

-          Presidio-Renoir 10-Storey Condominium Building (Sucat, Muntinlupa City)

-          Lessandra Subdivision, Land Development and Culvert (Molino, Cavite)

-          Presidio-Bellini, 5-Storey Condominium Building (Sucat, Muntinlupa City)

Position:

-          Project Engineer (Structural and Architectural)

·         Site supervisor and Implementation

·         Formwork Engineer

·         Rebar Engineer

·         Concreting Engineer

·         M & E

·         QA/QC

·         Surveyor

·         Productivity Report

·         Scheduler

-          Quantity Surveyor (Structural and Architectural)

·         Estimate Quantity (All materials both Structural and Architectural)

-          Office Engineer (Structural )

·         Documentation

·         AutoCAD

·         Cutting list

 

 

Company: JVRL Construction (March 2008 – August 2008)

Project:

-          ASYA 2 Boracay Resort, 10 units 2-Storey Residential House (Boracay Island, Malay, Aklan)

Position

-          Project Engineer (Structural)

·         Site supervisor and Implementation

·         Formwork Engineer

·         Concreting Engineer

·         Rebar Engineer

·         QA/QC

-          Quantity Surveyor (Structural)

·         Preparing Billing

·         Quantifying the accomplished work

·         Estimating of Cost and Quantity 

-          Office Engineer (Structural)

·         Documentation

·         AutoCAD

·         Scheduler

 

Company: DATEM Incorporated (May 2007 – March 2008)

Project:

-          St. Luke’s Medical Center (Fort Bonifacio Global City, Taguig City)

Position:

-          Project Engineer

·         Preparing Cutting List using Autocadd

·         Rebar Engineer

·         Concreting Engineer

·         QA/QC (Rebar and Concreting)

-          Quantity Surveyor

·         Rehashed Estimating of Rebar

·         Estimating of Pouring of Concrete Area

-          Office Engineer

·         AutoCad

·         Ordering/Batching Concrete

·         Cutting list for Rebar

Experience Hours (Planning & Scheduling): 
8000
Experience Hours (Cost Management): 
4000