Project Controller, KBR Kellogg Brown and Root Pty Ltd, AIR5402 MRTT Air to Air Refuelling Project

START Date: 
October, 2007
END Date: 
April, 2009
  • Maintain the AIR5402 project schedule, implemented in Open Plan Professional (OPP) software.
  • Maintain the AIR5402 Project Work Breakdown Structure (PWBS).
  • Maintain the Contract Work Breakdown Structure (CWBS).
  • Maintain the project Performance Measurement Baseline (PMB).
  • Guidance and support in the use of scheduling and reporting tools to Project Office Staff.
  • Develop and prepare project performance reports to the Improve Project Scheduling and Status Reporting (IPSSR) Program standard.
  • Analyse the Contractor’s schedule performance.
  • Analyse the Contractor’s Cost Schedule Control System to validate the Contractor’s scheduling data
  • Revise and update the Project Scheduler Work Instructions as required