Construction Project Planner, Al Rawaj Trading& Contracting LLC, Gammon India Ltd, Commercial, Residential, Metro Rail & Industrial Sectors

START Date: 
March, 2009

 

Competency Matrix 

Project Management, Planning and coordination:

Ü  Executing projects in a time bound manner with various project related activities such as Planning, Method Engineering, Construction Supervision, ResourcePlanning and Pre-Construction Activities.

Ü  Anchoring on-site construction activities to ensure Completion of project within the time & cost parameters and effective resource utilization to maximize the output.

Ü  Participating in project review meetings for tracking project progress, de-bottlenecking and implementation of Earned Value as per norms and standards.

Ü  Coordinating with various stakeholders and have effective communication.

Ü  Focus on results. Effectively identify and resolve problems using creativity and available resources. Tackle tough problems and follow through to satisfactory conclusion.

Ü  Preparation of Method Statements in advance & change them as per the site conditions to generate the cash Flows even in critical situations.

Ü  Preparation of Time Cycles, Rotation Cycles of materials & manpower effectively by using various Planning Techniques.

Ü  Preparation of Cash Flows & S-Curves

Contract Administration & Management

Ü  Coordinating among consultants, contractors and clients as well as reviewing tender documents/specifications & finalization of requirements, estimates & BOQ.

Ü  Interpreting contractual (Item Rate and Lump Sum) obligations & rights as well as evaluating Technical / Financial problems for Management reporting.

Ü  Making Preliminary Cost Estimates for constructions and upgradations of civil structures

Site & Construction Management/Resource Planning

Ü  Supervising construction activities including providing technical inputs for methodologies of construction & coordination with Site Management.

Ü  Site resource Management.

Ü  Monitoring site progress and QA/QC.

Ü  Preparation of Bills for Clients, Sub Contractor Bills

Professional Scan

 

1.            Corporate Project Planning

Role                       : Project Planner

Company                : Al Rawaj International Trading & Contracting L.L.C

Description            : Project comprises of which comprises of B+GF+7 Typical Floors+Pent House

      Tenure                   :   20th May’12 to Till Date

      Projects                 :

S.No

Project Name

Client

Consultant

Project Cost

1

Construction of Commercial/ Residential Multi Storied Building

M/S Shanfari

M/S Al Saqf Engineering Consultancy

RO 3.6 Million

2

Construction of Mosque, Imam House & Associated Shops

Ministry of Awqaf & Religious Affairs

M/S Arab Engineering Bureau

RO 1 Million

3

Construction of Commercial Furniture Show Room

Mr. Mohammed Ghailani

M/S Al Manarah Engineering Consultancy

RO 1.75 Million

4

Construction of Proposed Factory, Ware Houses & Associated Buildings (Phase-I)

M/S  Oman Fiber Optic CO SAOG

M/S SEMAC & PARTNERS LLC

RO 1.64 Million

5

Centralized Planning

 

 

 

 

      Responsibilities     :  

·       I have been assigned as a Project Planner for the above projects and as well as Corporate Planning .

·       Determining the resources required for the project i.e., men & materials by calculating the quantities as per approved drawings.

·       Monitoring on daily basis & reporting the same to higher authorities.

·       Preparation of Daily Progress Reports, Weekly Progress Reports

·       Preparation of Cash Flows on Monthly & Weekly Basis

·       Preparation of Micro Schedules using Microsoft Project 2007

·       Preparation of Recovery Program & calculated resources required.

·       Part of the member in Tendering & Contracts Departments to prepare Tender Schedules, Manpower, Machineries & Monthly Cash Flows accordingly.

·       Active Role in preparing MAS as per Procurement Schedule approved by Consultants

·       Arranging Weekly Progress Meetings for all sites individually and allocating the resources on priority basis which meets the Progress as per schedule

·       Coordinating with Financial Team with prior information to settle the payments, which doesn’t hindrance for the progress

·       Preparing the Rate Analysis and Control Estimate for the projects

 

2.    Chennai Metro Rail Project, Chennai, India

 Role                      : Assistant Manager

 Company               : Gammon India Ltd

 Project                  : Construction of Underground Stations & Associated Tunnels.

 Client                    : Chennai Metro rail Ltd

 Description           : Project is the Joint Venture Gammon- Mosmetrostroy

·                   Project comprises of two different packages named as UAA 02 & 03. UAA 02 contains 3 stations & Connective Tunnels and UAA 03 consists 4 stations & connective tunnels.

       Tenure                  :   06th Oct’11 to 15th May’12

 

Responsibilities      :  

·       As a part of the Chennai Metro Rail Project, I have been associated with Planning Department.

·       Determining the resources required for the project i.e., men & materials by calculating the quantities as per approved drawings.

·       Associated with Package UAA 03 for monitoring on daily basis & reporting the same to higher authorities.

·       Preparation of Daily Progress Reports, Weekly Progress Reports

·       Preparation of Cash Flows on monthly basis

·       Preparation of Micro Schedules using Primavera P6

·       Preparation of Time Chainage Chart

·       Preparation of Recovery Program & calculated resources required.

·       Part of the member in preparing Control Estimate.

 

3.    Novotel Hotel Project, Mumbai, India

 

            Role                : Assistant Manager

       Company         : Gammon India Ltd

         Project           : Civil & Structural Works for Novotel Hotel Project.

             Description     :

·       Blue Ridge Hotel Pvt Ltd is the owner who are world’s famous company which specializes in construction of 5 Star Hotels

·Novotel Hotel Project, which comprises of 4B+LGF+LLL+GF+SF+11 Typical Floors

Tenure            :  25th Sep’10 to Till Date

  Responsibilities:

·       As a part of the Novotel Hotel Project, I have been associated with Planning Department.

·       Preparation of Construction Schedule in M.S.Project, Monthly Micro Planning Schedules in M.S.P by using new Planning Techniques.

·       Determining the resources required for the project i.e., men & materials.

·       Conducting Daily & Weekly Progress Review Meetings and Monitor the Progress Accordingly.

·       Preparation of Method Statements in Advance & Changes as per Site Conditions to generate the Cash Inflows accordingly.

·       Preparation of Form Work, Staging Materials & Manpower Rotation Cycles to make my Project Economical & Optimum Utilization  of Time & Fewer Materials.

·       Monitoring, Presenting & directing and ensuring everybody to work in terms of Productivity.

·       Preparation of Control Estimate of the Project.

·       Coordinate with Head Office in procurement of Steel & Shuttering materials & the same should reach to site at required time.

·       Responsible for making Column & Retaining Wall Shuttering Boards by fabrication.

·       Participate in the Client billing & the same to monitor by Head Office by entering in ERP.

                                                                                                                                                          

4.    Neelkanth Kingdom Project, Mumbai, India

            Role                 : Assistant Manager

            Company         : Gammon India Ltd

            Project             : Construction of Neelkanth Kingdom Project.

Description      :

·       Neelkanth Constructions is the world’s famous company which specializes in construction of High Raise Buildings and apartments.

·       Neelkanth Kingdom Project, which comprises of 7 different apartments and Podium throughout the inner circumference of the project

Tenure             :  8thth Feb’10 to 24th Sep’10

Responsibilities:

·       As a part of the Neelkanth Kingdom Project, I have been associated for Nalanda  and Takshashila buildings which is 13 storied building and having 6 flats at each floor.

·       Supervision of R.C.C Structure, Block Work, Internal and External Plastering, Gypsum works, Marble & Tiling Works and Plumbing works

·       Preparation of subcontractors billing of above works and the same entered in ERP.

·       Planning for Daily progress and monthly progress reports.

·       Development of the project as per the requirements, standards and the satisfaction of clients.

·       Coordination with contractors, Superiors and subordinates on daily basis

 

5.    Hotel Leela Palace, Chennai, India

            Role                 : Assistant Manager

            Company          : Gammon India Ltd

            Project             : Construction of Hotel Leela Palace.

Description     

·       Hotel Leela Venture Ltd. is the world’s famous company which specializes in construction of Deluxe Five Star Hotels and Resorts.

·       Hotel Leela Palace, which comprises of two Phases namely Tower Area having 15 Floors and Non Tower Area having 5 floors which includes Swimming pool and Grand Ball Room.

Tenure             :  5’March 2009 to 6th Feb’2010

            Responsibilities:

·       As a part of the Hotel Leela Palace, I have been working in Non Tower Area which is very complicated area in the project which includes Grand Ball Room of size 2286sqm, Swimming Pool of size 686sqm, Ramp, Water Wall, more Four Floors and other miscellaneous works.

·       Preparation of subcontractors billing of Reinforcement and Form work and the same entered in ERP.

·       Preparation of Daily progress and monthly progress reports.

·       Development of the project as per the requirements, standards and the satisfaction of clients.

·       Nominated as a best Safety Nominated Safety Officer for one month

             High Lights        :

·       The efforts of our team were highly appreciated, both by the client and the top management at our project as the project was very critical for the client and thereby for the relationship