Northeastern Wisconsin and the Upper Peninsula of Michigan are served electrically by 345- and 138-kilovolt transmission lines that are some of the most constrained in the ATC system. These constraints limit ATC's ability to move power in and out of the Upper Peninsula, and cause overloading on other parts of the electric system. To address the reliability problems, ATC is proposing a new 50-mile transmission line from the Morgan Substation south of Oconto Falls to a new substation - called Werner West - in the New London area. The Morgan-Central Wisconsin-Werner West line will relieve congestion on facilities in and north of Green Bay, resulting in additional transfer capability and greater electric reliability for the area. In addition, it will provide capability for transmission service for a new power plant being built in the Wausau area.
http://www.planningplanet.com/node/add/experience?destination=ppredirect/experience

 

As a project controls engineer of above described project,

1. development of detailed project schedule with cost & resource loading

2. implement earned value analysis and provide report

3. run cash flow projection to be used for accounting

4. work-down curve and resource allocation projection curve

5. weekly executive portfolio report

6. document control