  • April  2014 – Till now

-          Employer:Parsons International – Abu Dhabi – UAE

-          Job title:Lead Planning Engineer

-          Client: SOC (South Oil Company at IRAQ)

-          Project: Common Seawater Supply Project (CSSP) - Seawater Treatment Facilities FEED

The key objective of the project is to provide Front-End Engineering Design (FEED) of the Seawater Treatment Facility (STF) for Phase 1 of the Iraq Common Seawater Supply Project (CSSP). The CSSP STF will provide a new seawater treatment plant including power generation, utilities, seawater treatment infrastructure, associated process and non-process facilities and offsite. The deliverables required to support the bidding process for the Engineering, Procurement & Construction (EPC) contractor of the project.

-          Support Projects In Planning And Project Controls Aspects:

-          Das Island Residential Development – Client: ADMA – Role: Developing Project execution plan with deferent construction methodology.

 

-          Doha Metro – Client: Qatar Railways – Role: Planning & Project controls procedure preparation.

 

-          Qatar Long Distance Rail– Client: Qatar Railways – Role: LEVEL-3 PROGRAMME Preparation.

·        June  2013 – April 2014

-         Employer:BACSConsortium (Bechtel-Almabani-CCC-Siemens) Riyadh, Saudi Arabia.

-         Job title:Senior Scheduler & Planning Engineer.

-         Client: Arriyadh Development Authority (ADA).

-          Project:

-          RIYADH METRO PROJECT (PACKAGE 1-Line 1 & 2)- Value (USD 9.44 billion) (MobilizationPeriod)

The project comprises 6 lines, Line 1 (Blue line) runs in the North-South direction along Olaya and Batha streets, Line 2 (Red line) runs in the East-West direction alonge King Abdullah Road. Scop of work included underground stations, elevated stations, Tunnels with TBM, Viaducts and Park and Ride areas.

  • January  2012 – April 2014

-         Employer:Almabani General Contractors Co. (AGC). Riyadh, Saudi Arabia.

-         Job title:Planning team head in-charge.

-         Client: Arriyadh Development Authority (ADA).

-          Projects:

-       Development of KING ABDULLAH road (DEPKAR) - Value (500 milion Saudi Riyal)

The project comprises 6.8Km of roads (main road & service road), 4 U-turns Bridges, 2 Underpasses, 960m Fly-Over,  LRT (Lite Rail Train) median along the road with all utilities (storm water drainage, potable water, irrigation system, pump  stations, electrical utilities) landscape and hardscape, Its completion date is set for Dec 2013.

-       Tunnel Project of Makkah Road Intersection with Salahuddin Road (TPMR)- Value (150 milionSaudi Riyal)

A reinforced concrete tunnel of 300-m length made of a double cell structure, with the central wall made of elliptical columns.  The opened sections will be half-covered, to fit the requirements of the future bus system, and the cover resting between the abutment and the central columns wall.  The Project requires major utility relocations of storm water box culvert, sanitary pipe lines, and electrical-telecom cables., Its completion date is set for Aug 2015.

  • July 2009 – Dec 2011

-         Employer:Saudi Oger LTD (SOL). Riyadh, Saudi Arabia.

-         Job title:Project Planning and Control engineer.

-         Project:Princess Noura Bint Abdul Rahman University(PNU) ,Value (20 bilion Saudi Riyal)

Construction of the largest women university in the middle East, including 48 colleges, administration buildings, Research centers & Medical center.

  • June 2008 – July 2009  

-         Employer:Alexandria for construction (ACC) one of Talaat Mustafa Group (TMG) Co. Cairo, Egypt.

-         Job title:Planning and scheduling engineer.

-         Project:The international construction project(Madinaty) - Value (60 bilion Egyptian pound)

A fully integrated city 33.6 million square meters over 8- phases.

  • October 2007 – June 2008

-       Employer:Alexandria for construction (ACC) one of Talaat Mustafa Group (TMG)

-       Job title: Site Engineer

-       Project:Al Re7ab city – New Cairo

-       Job Role/Department: Engineering site supervision for civil works & Finishing Touches.

Professional Since: 
Jul-2007 (16.8 yrs experience)
Oldest experience: 
Apr 2014 (10.1 yrs experience, WARNING: 6.8 years variance with Professional Since)