Anthony Berry-Chetham
Planning Engineer since 1996, first project Rennovation of the Class 91 GNER Train Set (23 locos) and an upgrade in South Africa of a dedicated Iron Ore line from the mine to the coast - 9E Electric Locos. Several years in London working on the upgrade of the Underground, signalling, train stations development, upgrade of depots to take new rolling stock. Stint at the Ford centre of excellence Dunton working on the development of a new diesel engine followed by several years on pipelines from large dia clean water to foul water, gas and electric. BAE Systems on the JSF Fighter Plane project. Experience on Bio Mass Power Stations, Pumping Stations, Tunnels and Tunnelling methods, all types of X-ings from major motorways, rivers, canals, pipe bridges etc. Bridge Reconstruction and Railway Track Work. Lots of successful Claims Experience.
- Industry:
- Region: