Eser Şentürk
Hill International Company
07.2014-08.2016 (2 years, 1 month) | İstanbul(Avr.) - Turkey | Full-Time
I was working for Hill International as a planning engineer in mix used project with 8 blocks of Residential and 1 block of hotel. I controlled work schedules and plans of two phases of the project with Primavera P6. Detailed time plans and work schedules are being conducted with main contractor and control company. I prepared work schedule with Primavera P6 for 7200 activities and I updated this work Schedule weekly. I prepared monthly delay reports based on Primavera outputs for clients. This work Schedule has resources and costs. I and my manager was following cash flow tables. Project contains of 8 blocks of residences with 1401 residences and one blocks of hotel. This project has approximately 600000 square meters construction area.
Before this experience i worked as technical office engineer and cost estimator. I am very good at Autocad, Microsoft Excel and Microsoft Project. I am good at preparing bill of quantities. I can use functions of MS Excel and i sometimes used macros in order to accelerate some calculations about costs or time. I can use MS Project very well. I can prepare any kind of work schedule with real man hour values. I know all thing about Earned Value Analysis. I can calculate efficiency values with man hour values. I will take PSP and PMP certifications in the near future.
- Industry:
- Region: