Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Mohmmad Shakiful Islam

First Name: 
Mohmmad Shakiful
Last Name: 
Islam

 

  • ZUBLIN INTERNATIONAL                     From 16th February,2011 till to date.
  • Now I am working in Zublin International Qatar as Mechanical Engineer  from 16th February till now. I am working in Planning department of the company. I have completed training of Primevera 6 Version 7 recently and working as a planning engineer.

 

  • Estimation: I have been working as a Mechanical Estimation Engineer from August, 2012 till to date. I was in charge for the Mechanical Estimation for the following Projects using  Arriba Construction Suites Software:

 

1)      Lusail Multipurpose Hall, Package 2;

2)      Al Sadd Multipurpose Hall, Package 2;

3)      Central Plant 5 (CP-5) at Qatar Foundation;

4)      Energy City Qatar.

 

  • I have been working as Design Mechanical Engineer for Austrian Embassy-Qatar, located in 33rd Floor of Palm Towers, West Bay. This project was designed in house and I was in charge for designing HVAC, Fire Fighting and Plumbing sevices.

 

  • I have been handling mechanical works in Khalifa Port and Industrial Zone, UAE form February, 2012 to 31st May, 2012. Khalifa Port is situated in Taweela, UAE. I was in charge of  mechanical works ( HVAC, Fire fighting and Plumbing) for Harbor Master’s Building, Substations, NAVAID and Port Craft Workshop, Sand Blast and Paint shop, Security Buildings, CNIA and Terminal Operation Building, Fire Station, Potable water Pumping Station, Warehouses and Staff Control Building.

      Project: Khalifa Port and Industrial Zone.

      Location: Taweela, Abu Dhabi, UAE.

      Client: Abu Dhabi Ports Company.

      Project Management: Bechtel Overseas Inc.

      Consultant: Halcrow .

      Main Contractor: Zublin International Qatar-Al Jaber Engineering UAE, JV

      MEP Contractor: Rotary Gulf, Hastie Group.

 

           RESPONSIBILITIES:

 

1.       Following up the works at site and supervise the subcontractor to carry out works quality wise.

2.      To prepare the punch lists for the remaining works.

3.      To check the design and site coordination.

4.      To plan the works to carry out within the target date.

 

             

  • I was in charge of all Mechanical services designing (Plumbing, water supply and Air Conditioning) and site execution and coordinate to Sub-contractor for all electrical works for Buzwair Family Villa from June, 2011 to January, 2012.

      Project: Buzwair Family Villa.

      Location: Al Hilal, Doha-Qatar.

      Client: Buzwair Real Estate.

      Consultant: ICI International.

      Main Contractor: Zublin International Qatar.

     

 

           RESPONSIBILITIES:

          

5.      Making design for ducting, water supply and drainage systems as per Client Requirement.

6.      To check AC units Selection done by Subcontractor “Tadmur” and coordinate ducting layout with “Tadmur”.

7.      To prepare air outlet schedule, plumbing fixture schedule, etc.

8.      To calculate pump head and capacity and pipe sizes of water supply.

9.      To give direction for site installation of Plumbing and Drainage works to Subcontractor “Structurel Qatar”.

10.   To check the electrical issues with Subcontractor “Structurel Qatar”.

  

       

  • Apart from the above works I used to check some Tender Issues for DOHALAND and MUNTAZAH Project. In DOHALAND project, I worked for LEED requirements for the project especially in Air Conditioning and Waste Water Treatment system.
  • I worked in estimation for all Mechanical services of Duty free Warehouse and Inflight Duty free Store of New Doha International Airport.

        

 

  • ELECTRICAL REFRIGERATING ENGINEERING CO., W.L.L.   From 1st October, 2007 to 14th February, 2011.

 

  • I  worked at ELECTRICAL REFRIGERATING ENGINEERING CO., W.L.L. as a Site Mechanical Engineer from 1st October 2007 till 15th February 2011 as a Mechanical Engineer and I am in charge of Plumbing (Water Supply and Drainage), Fire fighting and HVAC. Now, I have been promoted to Senior Site Mechanical Engineer in the same company           

From 1st January 2010 till 15th February 2011.

            Project: CITY CENTER EXPANSION PHASE II.

            TOWER MARRIOT COURTYARD. (3B+G+48F) &

            TOWER MARRIOTT RENAISSANCE, (3B+G+49F)  

            Location: West Bay near City Center, Doha-Qatar.

            Consultant: HOK (Canada), MSCEB.

            Main Contractor: Al HABTOOR ENGINEERING ENTERPRISES CO,(W.L.L)

 

            

 

 

 

           RESPONSIBILITIES:

          

1.       Making plans for installation of drainage, water supply, fire fighting & air conditioning systems as per shop drawings.

2.      To prepare material submittal, make material inspection after approval.

3.      To prepare air outlet schedule, plumbing fixture schedule, etc.

4.      Have good knowledge in SMACNA, ASHRAE & NFPA standards.

5.      To prepare External Static Pressure of AHU, Fan, Pump head Calculation and submit for approval.

6.      To prepare material take off as per shop drawing and order material to supplier and prepare material submittal as per specification.

7.      To check the shop drawing and redesign of ducting using ductulator, piping as per site condition and make as built drawing by using AUTOCAD.

8.      To check the work and prepare inspection request to consultant and carry out inspection with third party inspector.

9.      To check performance of Air Handling Unit, Fan Coil Unit, Ecological Unit, Exhaust Air Fans, Fresh Air Fans, Smoke Evacuation Fans, Staircase Pressurization Fans and commission of these units.

10.   To carry out staircase pressurization system test as per civil defense requirement; the pressure difference across the door with all door closed, one door open and three doors open.

11.    To balance airflow and water flow by using Hood, Micro Manometer and pitot tubes, Rotating Vane Anemometer.

12.   To do close head test of pumps ( Fire pumps, jockey pumps, chilled water pumps) and prepare performance curve.

13.   To supervise flushing, back flushing, chemical adding in chilled water system.

14.   To prepare cartridge selection for automatic balancing valve of chilled water system.

15.   To install BMS devices in ducts and pipes for monitoring and control the system.

16.   To supervise Gray Water Plant room, irrigation system.

            17.  Prepare O&M Manual for Air Distribution System, Plumbing and Drainage System.           

       

 

         Project:  44 WEST BAY RESIDENTIAL TOWER.

 

         Clint: QATARI INVESTORS GROUP.

 

         Main Contractor: STRABAG QATAR.

 

         Consultants: MZ & Partner.          

 

        

          RESPONSIBILITIES:

          

1.       Making plans for installation of drainage, water supply, fire fighting & air conditioning systems as per shop drawings.

2.      To prepare material submittal, make material inspection after approval.

3.      To prepare air outlet schedule, plumbing fixture schedule, etc.

4.      To prepare External Static Pressure of AHU, Fan, Pump head Calculation and submit for approval.

5.      To prepare material take off as per shop drawing and order material to supplier and prepare material submittal as per specification.

6.      To check the shop drawing and redesign of ducting using ductulator, piping as per site condition and make as built drawing by using AUTOCAD.

7.      To check the work and prepare inspection request to consultant and carry out inspection with inspector.

8.      To check performance of Air Handling Unit, Fan Coil Unit, Ecological Unit, Exhaust Air Fans, Fresh Air Fans, Smoke Evacuation Fans, Staircase Pressurization Fans and commission of these units.

 

 

  • POWERMECH ENGINEERING W.L.L     From December 2006 to September 2007

 

  • I Worked at POWERMECH ENGINEERING W.L.L from December 2006 to September 2007 as a Site Mechanical Engineer.

Project:AWQAF Residential and Office Compound Building.

Location: Bin Omran in Doha -Qatar.

 

Main Contractor: Al JABER CONSTRUCTION CO, W.L.L

Consultant: Arab Engineering Bureau.

 

 

 

 

 

RESPONSIBILITIES:

 

1.       Making plans for installation of drainage, water supply, fire fighting & air      conditioning system as per shop drawings. 

2.      To prepare material take off as per shop drawing and order material to supplier and prepare material submittal as per specification.

3.      To check the shop drawing and redesign of ducting, piping as per site condition and make as built drawing.

4.      To check the work and prepare inspection request to consultant and carry out inspection with third party inspector.   

5.      To prepare bill of quantity (BOQ) from tender drawing.

Professional Since: 
Dec-2006 (17.4 yrs experience)
Oldest experience: 
Feb 2011 (13.2 yrs experience, WARNING: 4.2 years variance with Professional Since)
Years Experience: 
43

Market Place

Primavera P6 and Microsoft Project books, on-line video training courses and training material available from an internationally recognised publisher. Teach yourself using on-line or book based learning or run your own in-house or public courses.