More than ten years experience in construction with the exposure of Power plant, Ethylene plant, HDPE plant, Olefins plant, Polyethylene plant, Butane BTX plant and LNG Plant. Outstanding in working with international managers and staffs.  Areas of expertise include Planning and Scheduling, Coordination, Material Control, Project Management & Supervision

Engineering, Procurement, Construction, Management, Pre-Commissioning and Commissioning

             

HIGHLIGHTS OF VALUE TO A POTENTIAL EMPLOYER

  • Prepare project trends and forecast to update the Project projection to be included in the Monthly Progress Report
  • Performed Earned Value Analysis in monitoring the project.
  • Resources loading / leveling and costing
  • Monitor supplier’s contractors periodic reports
  • Monitor engineering drawings and procurement reports
  • Create / develop schedule scenarios to help mitigate future delays in the project
  • Primavera P3, P6.1 and P6.7 expert, Microsoft Office Software, MS Powerpoint, has knowledge of AutoCad 2000, SPR “Smart Plant Review”, Citrix ICA Client, Adobe Acrobat , Photoshops. Naviswork and Ms Project

 

PROFESSIONAL EXPERIENCE - More than ten years experience in Engineering, Procurement, Construction and Management, Power and Oil/Gas Companies.

 

KBR Pty. Ltd (Kellogg Joint Venture – Gorgon)

Plant Site: LNG Plant, Gorgon Project Barrow Island, Western Australia

Current Job Title: Lead Specialist, (Scheduling / Planning) from 21-Apr-2012 – 27-Sept-13

Review level 3 master schedules and perform analysis of the level 4 Subcontractor schedules. Develop interface schedule for Upstream and downstream activities. Assign resources and update the level 3 master schedule. Perform critical analysis and mitigate. Coordinate with supervisors and superintendents.

THE SHAW GROUP

Plant Site: SPT SOP2 Ethylene Project, Jurong Island, Singapore

Job Title: Planning Engineer II from 01-Jun-2009 – 19-Apr-12

Prepare Project Baseline Schedule from Engineering, Procurement, and Constructionup to Commissioning. Update project schedule in a monthly basis. Coordinate with Construction manager and project engineers with regards to the status of the project.Prepare and update resources loading. Implement project-wide Work Breakdown Structure. Manage schedule backups and baselines. Supervise 3 Junior Planner and monitor their daily and weekly reports.

Special assignment to review and monitor level 4 schedule for Insulation / painting, vessel cleaning and dressing.

Plant Site: HDPE & BBTX Project, Yanbu, Kingdom of SaudiArabia

Job Title: Planner & Scheduler from 13-Oct- 2008 – 31-Mar-09

 

Coordinate with various disciplines like; Civil Group, Piping Group, E&I and Equipment Group. As well as coordinate to subcontractors relating to construction works for proper work execution at site and ensure proper planning. Coordinate with logistics for the Material and Equipments ETA (Estimated Time Arrival) and ATA (Actual Time Arrived) prior to allocating it to lay down yard and/or installation. Monitor Weekly and Monthly Progress status at level 3 & 4 and procurement status. Gather and compile relevant data as per project requirement. Insure that all target dates as per schedule are properly executed. Conduct site ocular inspection Coordinate project heads. Prepare recovery schedule to a certain project for client’s approval if additional quantity and extended schedule or whichever cases may apply. Analyze critical path and check it on site.

Plant Site : Ethylene Project, Sharq 3rd Expansion Project, Jubail, Kingdom of Saudi Arabia

Job Title: Planner & Scheduler from 13-Jun-2006 to 30-Jun-2008

Reviewing subcontractor’s schedules and prepared three weeks / three months look ahead especially for the Buildings and BOP area. Develop progress tracking sheets, reporting and preparing progress curves. Prepare weekly, monthly and quarterly reports for the client / internal. Prepare/Conduct Monthly Top Management Joint Review Meeting for Project Status. Develop schedule to support the construction.  Attend coordination meeting and weekly meeting. Participated on many phases of project as coordinator to push multiple work packages to completion

Plant Site: Ethylene Project, BASF-YPC Company Limited IPS Project, Nanjing, Peoples Republic of China, Job Title: Planner & Scheduler from 15-Mar-2004 to 15-Mar-2005

Prepare and review the L4 schedule of our subcontractors, coordinated with the Project Superintendents and mitigate the critical issues. Provide monitoring sheets and create a work break down. Coordinate with the precomissioning and commissioning team.

JGC Corporation Plant Site : Ethylene Project, CSPC Nanhai Petrochemical Project (LOP Process Unit)Huizhou, Peoples Republic of China,

Job Title: Commissioning Supervisor from 18-Sep-2005 to 9-Jan-2006

 

Duties and responsibilities:

Prepare all the materials needed for flushing, steam blowing & air blowing. Involved also gas testing. Conduct inspections of all kinds of materials needed to use in the commissioning. Conduct steam blowing, air blowing, water flushing, air freeing and tightness test. Involved also in motor solo run test, loop checking and hydro testing. Reinstate pipe after the hydro testing.

Sepam Arabia Specialist

Plant Site: Ethylene Project, Jubail United Petrochemical Company, Al-Sinaiyah, Jubail, K.S.A.

Job Title: Planner & Scheduler from 1-Dec-2003 to 01-Mar-2004

Work as a subcontractor Electrical and instrument planner. Participation of progress review meeting. Make allocation report, spent and earn ratio, demobilization plan and spread sheet used for the projects. Separate scope of work and discuss to the client. To develop, monitor & update the master schedule, productivity and commodity curves.

 

Plant Site: Saudi Toyo Engineering Corporation,  Petrokemya Polyethylene Projects , Saudi Arabian Basic Industries Company, Al Jubail, K.S.A

Job Title:Cost Planner/ Scheduler from 01-May-2003 to 31-Nov-2003

Develop L3 schedule. Quantity surveying and update master schedule. Perform and manage project activity scheduling and monitoring and provide planning and cost controlling support for all projects which includes variation reporting, monitoring of milestone progress. Involved in the preparation of project proposals, and prepare estimates of extra works and various change orders and also evaluate project change cost impacts

 

 

Hadi Haider Company

Plant site: Ghazlan II Power Plant Project Mitsubishi Heavy Industries, Saudi Electric Company, Rastanoura, K.S.A

Job Title: E&I Supervisor from 15-Oct-1999 to 15-April-2003

Assign in boiler area and control room and supervise cable pulling and termination department. Allocation of manpower and distribute their job. Submit daily report to the management. Material take off and material controls. Attend daily progress report. Monitor production reports both electrical and instrument discipline. Perform continuity check, loop check, and high pot testing. Assist the commissioning team.

 

Kakuyo Philippines Corporation

Plant Site: Mepz, Lapu-Lapu City, Cebu, Philippines

Job Title: Production Staff / Supervisor from 01-Aug-1998 to 1-Oct-1999

Planning and controlling of the production. Ensure that the camera is on standard quality. Assign at Olympus camera C2536 model factory & monitor the production lines. Participation in progress review meeting and preparation of weekly reports. Update and submit reports to our Japanese manager. Monitor of progress and update analysis of schedule, productivity and commodity curves. Conduct training to newly arrive workers.

Mactan Apparel Incorporated

Plant Site: Mepz 1 Lapu-lapu City, Mactan, Philippines

Job Title:Electrical Technician from May 1998 to August 1998

Responsible for all the machines used by the production, design and repair all the AC/DC motors, transformer. Conduct training to our newly workers desired to work as a maintenance. Repair and rewinding electrical monitors. Repair and re-designing of transformer

Airpro Industrial Corporation (Mitsubishi Heavy Industries Subcontractor)

Plant Site: Mandaue City, Cebu Philippines

Job Title: Ojt, Electrical Technician from December 1997 to March 1998

Work as an electrical technician of Refrigeration Company. In charges of all the electrical works and maintain the machine. Provide daily reports to the manager.

Cebu Industrial Marine Engineering Corporation(Former William Lines Engineering Shipping Lines)

Site Office: Mabolo, Cebu City Philippines

Job Title:OJT Electrical Technician from March 1997 to December 1997

Assign at maintenance section and train to manage machineries. Design motors and transformers. Train as supervising and organizing. Rewinding of motors single phase and three phases. Designing of transformer from step down to step up.

Education:

BS Electrical Engineering, Under ETEEAP at University of San Jose Recoletos, 2007

BS Industrial Technology, major in Electrical Technology at Cebu Technological University “former Cebu State College of Science in Technology, 1998

                             

Professional Since: 
Sep-2003 (20.7 yrs experience)
Oldest experience: 
Jun 2009 (14.9 yrs experience, WARNING: 5.7 years variance with Professional Since)
Years Experience: 
8