2008 - Present - Managing Director - Project Controls (Kazakhstan Petrochemical Industries Inc.)
Fisrt Integrated Petrochemical Plant Project, Atyrau/Kazakhstan
The project estimate is over 6 billion US$. The project, to be located in the west of Kazakhstan, will consist of producing 833ktpa Polymer grade ethylene, 33ktpa Butene-1, 400ktpa HDPE/LLDPE, 400ktpa LDPE, 500ktpa Polypropylene with PDH unit, offisites and utilities, Gas separation unit (630 million m3/hr), Combined Cycle Power Plant (280 MW) and various Inrastructure activties.
2007- 2008 Project Coorinator/Project Manager - Capital Partners / BASE-MK - A/Kazakhstan
A mountaion resport development (project) is located in Almaty / Kazakhstan. Total 600.000 sqm ressidences, 5 start hotel, Gondola and related infsratructure projects. working with HOK, Robert Stern Arcthitect, ARUP etc.
7 different and unique relat estate projects design phase, including residence 5 star hotels, retails service apartments.. working with Ian Ritchie, WATG, RMJM, ARUP etc. Preparetion of IPO to london Stock Exchange.
2004-2007 Senior Project Controls Engineer - Bechtel-Enka J.V - Second Generation Project, Atyrau/Kazakhstan
Construction of the Crude Stabilization Unit, Gas Processing Plant and Sulphur Unit form, Utilities and Offsites and 123MW power plant a part of second generation project. The client was Tengizchevroil (TCO)
2001-2004 Project Controls Engineer - Siemens - Guris J.V - Bursa Light Rail Transit System Project, Bursa/TURKEY
CAREER SUMMARY
10 years experince encompassing Client & Construction & Project Controls. Broad responsibilities included the following;
Manage the interface between licensors, contractors, subcontractors, and consultant
Control of project management company and instruct the work load. Control and desicion making on facility specificaion of the projects.
Decision making on strategic management, design related issues.
Prepare ITB (Instruction to bidders) packagess, manage pre-qualification phase, and evaluate the bids and assign contractors.
Prepare project control execution plans, schedules, cost management, estimates etc
Preparation of daily, weekly and monthly report as well as board of directors related reports.
Contract preparation, negotiations.
Control of contractors reports, works.
Business plan preparation
Enviromental Impact Assesment related works
Preparation of Feasibility Study
Dept Financing related activities such as contract, scheduling, providing technical information