glf Project Engineer

START Date: 
September, 2002
END Date: 
August, 2003
Port Everglades | 1849-1851 SE 27th St.| Hollywood, FL | 33136 USA

Seawall Stabilization Project at Port Everglades, FL – Contract Value $5M
Installation of approximately 950 feet of steel sheet pile and connecting to the existing anchor wall. Provide and install 40’X60’ pre-engineered steel storage building. Finally, installing 310 auger cast piles.

•     Prepared As Built Drawings
•     Schedule Update
•     Prepared Monthly Pay Application & Monthly Report
•     Directed and checked subcontractors’ work