START Date:
December, 1986
END Date:
March, 1989 The project scope consisted for the Design required for the removal of the existing Magnox Dissolver Vesel and its associated equipment (Mechanical, piping,electrical, instrumentation and loss control systems.
Experience Hours (Planning & Scheduling):
4850