JUNE 2003 TO DEC 2004 Foster Wheeler<?xml:namespace prefix = o />
Lead Planning Engineer
NANHAI PROJECT <?xml:namespace prefix = st1 />CHINA (CNOOC-SHELL)
US$4 Bn PETROCHEM
Recruited to be a lead planner for the scheduling and reporting function on this prestigious project. Reporting to the Field Control Manager, and responsible for managing the Primavera master schedule, linking manhours, quantities, Work Breakdown Structure. Producing curves for all disciplines, monitoring weekly and monthly progress. Critical Path Analysis, What if scenarios, recovery programmes etc.