Website Upgrade Incoming - we're working on a new look (and speed!) standby while we deliver the project

Temporary Electrics and Power Consumption Costing

During tender stage, time is often at a premium and various early assessments are required to be made to enable a subcontractor to produce a tender price in time for bid submission. The attached spreadsheet performs a budgetary function to identify infrastructure costs, power consumption and usage costs. The entry data is simple and budget costs can be identified in minutes. These costs could be added to the tender preliminaries should prices from the temporary electrical subcontractors not be available.

ADVICE: You need to be a Guild Member to view / download the articles in the Guild's Library.