Guild of Project Controls: Compendium | Roles | Assessment | Certifications | Membership

Calculating Float

Calculating and Using Schedule Float

"Calculating and Using Float" by Patrick Weaver

Abstract:

Schedule Float is the creation of the Critical Path Method (CPM) of scheduling. Before 1957 ‘float’ only had one meaning now it has several. The origins of scheduling and consequently float is discussed in two papers: 

ADVICE: You need to be a Guild Member to view / download the articles in the Guild's Library.

Syndicate content