How to use P6 various Percentages in Project Control?

Title: "How to use P6 various percentages in project control?"

Author: "Deyi.zhang/张德义"

Abstract: The progress of the project image in China is often referred to as a word. It uses the physical form of the building product to reflect a special form of construction progress. It usually uses words to combine physical quantities or percentages, concisely reflecting the image achieved by the construction project. Location or progress. We must not allow adjectives such as partial and basic completion of fuzzy concepts. There are many kinds of percentages in P6 software, but these percentages are not exactly the same percentage as our conventional image. Therefore, this article aims to explain the intension of various percentages, so that you can combine them with your work practice..

 

在项目控制中如何使用P6各种百分比?

在中国工程形象进度是经常提到的一个词,它用建筑产品实物形态反映建设进度的一种特殊表现形式,一般是用文字结合实物量或百分比,简明扼要地反映已施工工程所达到的形象部位或进度情况。决不允许有部分、基本完成等模糊概念的形容词。在P6软件中存在着很多种百分比,但这些百分比并不完全和我们常规意义的形象百分比相同,所以本文旨在阐述各种百分比的来龙去脉,方便各位和工作实践中结合起来。

ADVICE: You need to be a Guild Member to view / download the articles in the Guild's Library.