How to use P6 to realize interface management in large-scale engineering projects?

Title: "How to use P6 to realize interface management in large-scale engineering projects?"

Author: "Deyi.zhang/张德义"

Abstract: In some EPC type projects, the physical interface exists in a large number of project construction processes, including the interface during the project implementation process, such as the interface of different design stages in the design process (the interface between the design of the solution and the preliminary design, etc.) and the construction process. The interface between different processes and the interface between the equipment installation and the engineering entity. This article focuses on the flexible use of P6 to implement interface management.

大型工程项目如何使用P6实现界面管理?

摘要

在一些EPC类型项目中,实体界面大量存在于的项目建设过程中,包括项目实施过程中的界面,如设计过程中不同设计阶段的界面(方案设计与初步设计之间的界面等)、施工过程中不同工序之间的界面和设备安装与工程实体之间的界面等。本文重点介绍灵活使用P6实现界面管理。

ADVICE: You need to be a Guild Member to view / download the articles in the Guild's Library.