Home > Assistant Manager Project Planning, AL FANAR Gen Contracting L.L.C , Engineering, Procurement and construction EPC Project, NGD15039, CITY GAS NETWORK PHASE-1, Package -1 to 4
Submitted by Farhan Ahmed Memon on Thu, 2021-01-07 11:14
START Date:
October, 2016
- Develop, review and maintain the project plans and baseline schedules using Primavera
- Monitor progress throughout the construction process on a weekly basis and compare with work plan (Actual vs Baseline Schedule)
- Identify and review regularly, critical and sub-critical activities and monitor its impact on overall plan
- Develop and maintain project change control and review scope change requests for impact on schedules and the critical path of the project.
- Submitting planning package with all allied documents
- Ensuring availability of drawings in line with Master schedule plan and EDD Register
- Ensuring material order placement and Inventory tracking register (PR) in line with master plan
- Raising Technical Queries related to design and site issues
- Preparing / maintaining construction register and PMS for proper monitoring to track the productivity / Plan for invoicing
- Perform project risk assessment on delays and disputes and determine possible range of completion dates for the project (banana s-curve methods – Early start & Early Finish/Late Start & Late Finish)
- Prepare reconciliations between earlier schedules and as-built schedules (analyzing delay by window Technique/ Actual Vs As built schedule).
- Responsible for reviewing bill of quantities, scope of work, preparation on contract program and Identification of milestones
- Produce master and detail pre-construction and post construction schedules.
- Overseeing actual project progress versus the planned work milestones, in addition to reviewing consultants and contractors work program submissions.
- Preparing, monitoring, adjusting and updating the cost plan and cash flows
- Reviewing in conjunction with the Project Manager or Construction Manager any potential changes, and in turn measuring where possible future saving or additional costs can be identified.
- Attend regular monthly/weekly progress review meetings with clients and subcontractors and prepare work schedule for subcontractors.
- Prepare weekly/monthly reports on project status & progress and review project close-out reports
- Always deal with extension of time claims (EOT) as a priority
- PMP pursuing with strong knowledge and experience in project management methodologies.
Experience Hours (Planning & Scheduling):
5400
Experience Hours (Cost Management):
100
Experience Hours (Forensic Analysis):
100
Links:
[1] http://www.planningplanet.com/category/skills-expertise/100-project-planning-cost-control-budgeting-performance-monitoring-project
[2] http://www.planningplanet.com/category/training/1-primavera-p6-2-ms-project-3-ms-excel
[3] http://www.planningplanet.com/category/company/al-fanar-gen-contracting-llc
[4] http://www.planningplanet.com/category/job-role/assistant-manager-project-planning
[5] http://www.planningplanet.com/category/project/city-gas-network-phase-1
[6] http://www.planningplanet.com/category/project/engineering
[7] http://www.planningplanet.com/category/project/ngd15039
[8] http://www.planningplanet.com/category/industry/oil-gas-power
[9] http://www.planningplanet.com/category/project/package-1-4
[10] http://www.planningplanet.com/category/project/procurement-and-construction-epc-project
[11] http://www.planningplanet.com/category/region/middle-east-region/asia/united-arab-emirates-asae