Name | PRAMOD VILAS KAMBLE |
| |
Qualification | BE Mechanical , Diploma in Mechanical Engineeing, |
| |
Total Year of Exp. | More than 18 Years |
| |
Industries | Up stream and Mid stream ( Oil and Gas sectors, Refinery and Pipelines) |
| |
Skilled Areas | Project Planning and Controlling, cost control, Project Co-odination, Budget Control, Equipments and Resource Planning, Man-hrs calculations, EOT handling, claims management |
| |
Key responsibilities Handled | Preparation basic and detailed planning package. Prepare details Manpower and equipment’s status plan. Create various reporting formats, procedures |
| Review Sub-contractors progress and certify Invoices. Highlight critical Events to Management and raise alarms. Prepare EOT package. |
| Arrange training sessions to internal Team and sub-contractors. Supports my downward team in planning activities. Analysis EVA and PART chart for progress review |
| Prepare various reports for management review. Time to time all Projects study and time to time alert to management on Budget vs present status of the Projects. |
| |
Worked Organisations | Samsung Engineering Ltd. |
Overseas Organisation - | JSC OGCC KAZSTROY SERVICE, Kazakhstan As a Lead Planner (9/2013 – Till date) |
| AL-HASSAN ENGINEERING COMPANY S.A.O.G, Oman - As a Lead Planner (7/2012 – 8/2013) |
Domestic Organisations | |
| TECHNIP KTI LTD, Mumbai (Offshore ECP Division), Principal Engineer Project Control (1/2012 – 6/2012) |
| INDIAN OIL TANKING LTD, Mumbai, Manager Projects Planning (8/2008 – 12/2011) |
| Indus Projects, Ltd, Senior Planning Engineer from 2006-2008 |
| Neela Group presently know as Praz Industries, Project Planner 2000-2006 |
| |
Executed Projects - | 1. Timimoun Field Development Project (Gas Gathering and Export station – CPF & OFF Sites), Algeria |
Over seas Projects | 2. Caspian Pipeline Consortium Pipeline Project (Pump Station) Atyrau, Kazakhstan. (2013-2016). |
| CPC is joint venture of Rosneft-Shell, Chevron, KazMunayGaz, BG Overseas and ENI. This project is combination of four gas Pump station & cross-country pipelines from Kazakhstan to China |
| 3. Construction of Export Pipelines- OOCEP( Oman Oil Company), Pipeline project in Oman, (2012-2013) |
Domestic Projects | |
| 1. C-SERIES PH.2 and B-173A-B well platforms in support of the FEED Project for (ONGC), (2012-2012) |
| 2. C3 Stream Treatment System in Propylene Recovery Unit for IOCL Paradip Refinery, (2012-2012) |
| 3. Offsites and utility facility for IOCL a client at the Baroda refinery (2008-2010) |
| 4. 1X300MW MCCPL Power Project, Power Plant Capacity -: 300 MW- PF Boiler ( 2011-2011) |
| 5. Infrastructure and process facilities at top-side, Inside Cavern Shaft and within Cavern, at Vizag ISPRL client (2009-2012) |
| 6. Offsite and storage facility for a BCPL client at Lepetkata (Assam, Dibrugrah), (2010-2012) |
| 7. SS Replacement of Pilpeline, Reliance Plant |
| 8. Biotech Pharma Project at Wockhardt Limited. Bhaddi |