PETRONAS Carigali Sdn Bhd Kuala Lumpur, Malaysia – March 2013 - working
| Seconded to Petroleum Engineering Department as Specialist (Planning & Risk Management)
| |
| Provide Technical Assurance, Planning & Scheduling for: Development of SK316 Kasawari fieldand provide 900 MMscfd gross gas production to Petronas LNG Complex by 2019 with Central Processing Facility (CPP), Wellhead Platform (WHP) with 8 wells drilling, Central Collector Platform (CCP), Flare structure, Offshore pipelines. Total Cost of Project is ~4B USD.
Development of Tukau Timur (Gas) and Baronia fields (EOR) 400 MMSCFD & WI 100 kbl/d by using new facilities asNew CPP bridge linked to existing Wellhead Platform, 4 New WHPs with 20 wells drilling (Producers, Water Injectors), Intra-field and inter-field pipelines, 7 Brownfield activities at existing platforms modifications, and Rejuvenation at existing Complexes. Total Cost of Project is ~3.2B USD.
Seconded to Petroleum Engineering department and responsible for providing technical assurance for 40 studies, FDP and upcoming projects and strengthening global project control division on schedule assurance.
|