CARIER OBJECTIVE
Want to associate my technical skill for a job in the field of instrumentation and controls for oil & gas process .Field. Pre-commissioning, commissioning, start-up, and maintenance of all kind of process control Instrument.
* Personal Information
Birth date : 06/04/1964
Birthplace : BHUJ-KUTCH
Nationality : INDIAN
Religion : HINDU
Civil Status : MARRIED
Height : 175 cm.
Passport No. : H-676586
Date of expiry : 21/07/2019
Language Spoken : English Hindi & Gujarati
* EDUCATION QUALIFICATION ACADEMIC PROFILE
University : N.C.V.T Board(60.%) 1988 TO 1991
Schooling : S.S.C (50. %) Board GUJARAT BOARD OCT-1982
* CARRIER SUMMERY:
17YEARS (7yr in India &10 yr abroad) of experience in instrumentation in the field of oil & gas (LNG), Refinery, and Petro chemical. comprehensive experience in commissioning, Start up & maintenance activity.
Training
: Basic H2S traning approved OPITO
: IIF safety Traning Qatar gas,Doha Qatar
: Offhore Survival Training ,Abu Dhabi
: Breathing Apprqatus/H2S Evacuation
: Onshore Safety Induction Course
: Ras Gas Permite To Work(PTW) Course
: National Cadet Core (N.C.C) 2 years during school study.
* Work Experiences
* KAZ Project Operating LLP KASGAN OGD PROJECT
ATYRU, KAZAKHSTAN
19/SEP/2011 TO 01/APRIL/2014
POSITION :INSTRUMENT COMMISSIONING TECHNICIAN
Job Description:
Field and control room Cold and hot loop checking and foult finding and make sure for operation startup redy. Assit to vendor.
* ESTRAN BECHTEL COMPANY ASAB GAS PROJECT II ABHUDHABI, UAE.
29/DEC/2009 TO 24/JUNE/2010
POSITION : SR. INSTRUMENT TECHNICIAN ( COMMISSIONING) Job Description: Functional testing/ cause & effect test / sequence test. Assisted vendors for their finaltesting of all associated skid mounted control instruments to ensure the correct settings, tagsand ranges. Assisted to field operation on start-up and carry-out necessary adjustment on fieldcontrol Instrument as per operation Requirements.
*QATARGAS II (QGX) LNG FACILITIES PROJECT RAS LAFFAN INDUSTRIAL
BRUNEL ENERGY, QATARGAS,
From16/SEP/2007 TO 13/OCT/2009
POSITION : INSTRUMENT TECHNICIAN(LEAD TECHNICIAN OF COMMISSIONING &
MAINTAINACE)
Job Description:
Assigned in Process Area (SRU) and Common Lean Gas Loading Project (CLP) for witness of activities like cold and hot site acceptance test for all panels, Loop check /Logic check /Functional check/Cause and Effect testing related to field instrument & system side. Execute final checks and verification of System Mechanical Completion Packages (SMCP) related to Instrumentation prior to company acceptance
*SHAKHLIN ENERGY COMPANY-Shakhalin RussiaKENTEK CO WL.L.
From 21/JULY/2006 TO 06/MARCH/2007
POSITION: INSTRUMENT TECHNICIAN ( QC & MAINTAINACE )
Job Description
Functional testing/Loop checking of all field process control instruments prior to commissioning. Assisted vendors for their final testing of all associated skid mounted control instruments to ensure the correct settings, tags and ranges. Assisted to field operation on start-up and carry-out necessary adjustment on field control Instrument as per operation Requirements. After commissioning to carry out all field instrument preventive maintenances, break down maintenance, shutdown.
*RAS LAFFAN LNG CO., DOHA QATAR QATAR KENTZ W.L.L
From 02/AUG/2003 to 27/JAN/2005
24/JUNE/2001 to 18/JULY/2001
POSITION: INSTRUMENT TECHNICIAN.
Job Description
Worked as a Instrument technician After commissioning to carry out all field instrument preventive maintenances, break down maintenance, shutdown
*ADMA-OPCOZIP-OFFSHORE,ABU DHABICOSTAIN W.L.L ABUDHABI
From28/SEP/2002 to 17/OCT/2002
POSITION: INSTRUMENT TECHNICIAN
Job Description
Worked as Instrument technician in shutdown.(1month)
*ADGASDASISLAND,ABUDHABICOSTAIN ABUDHABI,W.L.L
From 22/Aril/2005 to 0/june/2005
30/oct/2002 to 17/NOV/2002
31/March/2001 to 10/May/2001
02/March/1997 to 30/May/1997
POSITION – INSTRUMENT TECHNICIAN
Job Description Worked as Instrument technician in shutdown. (1 month)all kind of Transmitter like Pressure, Flow, Temperature and Level etc during Shutdown remove all field Instruments for calibration & installed back on same location & also involve in modification job related to process *KUWAITNATIONLPETROLUMCO,KUWAITKUWAITKENTZW.L.L from01/Oct/2001 to 13/Nov/2001 08/March/20to 31/Nov/2000 POSITION:INSTRUMENTTECHNICIAN Job Description Functional testing/Loop checking of all field process control instruments prior to commissioning. Assisted vendors for their final testing of all associated skid mounted control instruments to ensure the correct settings, tags and ranges. Assisted to field operation on start-up and carry-out necessary adjustment on field control Instrument as per operation Requirements. After commissioning to carry out all field instrument preventive maintenances, break down maintenance, shutdown. *GUJARAT CARBON INDUSTRIES LTD INDIA From 28/January/1996 to 23/March/2000 POSITION: INSTRUMENT TECHNICIAN Job Description Functional testing/Loop checking of all field process control instruments prior to commissioning. Assisted vendors for their final testing of all associated skid mounted control instruments to ensure the correct settings, tags and ranges. Assisted to field operation on start-up and carry-out necessary adjustment on field control Instrument as per operation Requirements. After commissioning to carry out all field instrument preventive maintenances, break down maintenance, shutdown. *HITECH ORGOCHEM LTD, INDIA From24/March/1994 to22/January/1996 POSITION: INSTRUMENT TECHNICIAN Job Description Assisted to field operation on start-up and carry-out necessary adjustment on field control Instrument as per operation Requirements. carry out all field instrument preventive maintenances, break down maintenance, shutdown *PARAMOUNT POLLUTION CONTROL LTD, INDIA From 12/Nov/1991 to 03/March/1994 POSITION: INSTRUMENT TECHNICIAN Job Description Functional testing/Loop checking of all field process control instruments prior to commissioning. Assisted vendors for their final testing of all associated skid mounted control instruments to ensure the correct settings, tags and ranges. Assisted to field operation on start-up and carry-out necessary adjustment on field control Instrument as per operation Requirements. *CALICO POLYESTER FIBER DIVISION, INDIA From March 1989 to March1991 POSITION – INSTRUMENT TECHNICIAN TRAINEE Job Description I have successfully completed my Three year of training as an instrument Aprentic. during this period seconded the calibration of pressure gauge and all kind of Transmitter like Pressure, Flow, Temperature and Level etc during Shutdown remove all field Instruments for calibration & installed back on same location & also involve in modification job related to process