START Date:
January, 2012
- Assist the Planning Manager & Project Manager in the preparation of Master Baseline Schedule – New Doha International Airport Project Package.
- Attending in the Contractor’s Weekly Meeting with the Client (NDIA), Management (Bechtel), and other contractors’ representatives to discuss the whole project matter, issues and concerns.
- To prepare detailed schedule for the project scope of works and Change Orders considering main factors such as time-frame, milestone dates, manpower, and resources needed.
- To maintain the Baseline Master Schedule and to modify it if revision is required.
- Take a lead role in updating the Project Schedule using Primavera version 7.0 (P6), Critical Path Method (CPM), and Microsoft Excel.
- Monitors Milestone dates and the day-to-day activities on site to ensure that the planned schedule of activities is being implemented.
- To integrate various Contractor’s schedule across all areas.
- To setup and prepare Schedule Impact Analysis and coordinates with the Contract Manager for the purpose of claims and time extensions.
- Preparation of Weekly/Monthly Progress Accomplishment Reports
- Generates and prepares Production S-Curve, Productivity Index, Histogram, Bar Chart progress illustrations and Monitoring key plans.
- Proper time-analysis and resource allocation.
- Coordinates with Technical Department regarding the As-built drawings and Change Orders
- Monitors material delivery schedule through Logistics Department
- Participates in the Safety Task Analysis and Risk Reduction Talk (STARRT) regularly
- Attends the Weekly Contractors Coordination Meeting and Site Walk Through Assembly
- Coordinates with other contractors for possible solutions in support of site problems