Lead of Project Planning & Control Department - OEID - KHESHT OIL FIELD DEVELOPMENT (Basic Design Endorsement & Detail Design)
- Execution of Effective Project Data Gathering System and Provision of Integrated Project Planning & Control System Based on Primavera Expedition & Enterprise;
- Preparation of Project Master Time Schedule (Level V) Approved by Client
- Review instruction documents and Prepare Related Procedures, Document Register, Planned S-Curve, Time
- Schedule and other Documents for the Following Projects (with Cooperation of Project Planning and Control Members):
- TABRIZ PETROCHEMICAL COMPLEX - HIGH IMPACT POLYSTYRENE (HIPS) UNIT (EPC
- Contract)
- SIRRI ISLAND – WATER LIFT, TREATMENT AND INJECTION (EPC Contract)
- FULLY LPG SHIPS EPC PROJECT (EPC Contract)
- PMC & ONSHORE ENGINEERING OF SIRRI CABLE LAYING
Proposal Engineer Review instruction to tender documents and Prepare Document Register, Planned S-Curve, Time Schedule and other related Documents for 6 International EPC Tenders (3 New Platforms with 23 Topside Modifications of Qatar Petroleum, MORON PETROCHEMICAL COMPLEX-MORON – VENEZUELA …) and over 30 Internal Tenders (Such as SIRRI ISLAND – Refurbishment Works for Drilling Platforms DP-A, DP-B, DPC, DP-E, DP-F, DP-G, NOSRAT, NASR Production Platform and ILAM LQ , Sarvestan Saadat Abad Oil Field Development and…) |