START Date:
January, 2012
- Contract Baseline (Resources, Materials, Equipment, Cost),
- 4 Weeks Look Ahead Schedule,
- 90 Days Look Ahead Schedule,
- MTS (Material Tracking System),
- TIA (Time Impact Analysis),
- Productivity, Production Rates and
- Cost Control.