Role | Manager (Planning/Scheduling) |
Qualifications Total Experience Driving License Visa Status Nationality Date of Birth Martial Status Mobile No E-mail Address | B Eng in Civil Engineering(in 1st class), April’99 Certified Planning Scheduling Professional (PSP)from AACE International, USA., (The Association for the Advancement of Cost Engineering) Under gone training program for CCE (Cost Control Engineer ) From AACEI, USA Under gone training program for PMP (Project Management Professional) Certification Conducted by PMI recognised Institute in UAE, 15 Years(Progress) Holding a valid UAE & Sultanate of Oman driving license Resident Visa Indian 28-07-1978 Married 00971-50 3428797 sureshmdsr@gmail.com , |
Fields of Special Competence:
Experience in the Infrastructure, Sewer Network & Sewerage Treatment Plant (Open & Micro-tunnelling), Power Plant, Industrial (Structural Steel), Commercial & Residential Building Construction, EPC Sector, Power plant Construction (Thermal & Hydro Electric)
Career Summary
Mar’08 – Till Date | Manager (Planning & Scheduling) with Kier Construction, Abu Dhabi Currently working on - Command of Military Work Infrastructure Project – Sweihan
- Command of Military Work Minhad – Apron Construction
- Nad El Shiba Drainage work Open Cut/Micro tunnelling work
Responsibility on Site Activities - Preparing Master Programme
- Prepare Presentation on Project
- Coordinate and manage site Planner’s and monitoring the project
- Attend site meeting with Consulting/Client Engineers
- Prepare Claims and contractual correspondences.
Responsibility on Estimation & Tender Department – Area Office - Preparing Tender programme
- Preparing Method Statement
- Analyse Resource & Cash flow Chart
- Feasibility Study / Site Visit
- Participate in Technical Bid preparation
- Co-ordinate with Subcontractor and Vendors.
- IRAQ– BP Rumaila Infrastructure Project
- Command of Military - UAE
- Various Railway Projects in KSA
- DubaiMunicipalityDeira Creak Quay Wall Construction Project
- Borouge -3 Plant Expansion project
- Habshan Sulphur Station
- Habshan – 5 Industrial Facilities
- Al Ain Trunk Sewer Project
- Al Ain – ICLDC Phase 2- Diabetic Centre, Mubadala
- Samkha Infrastructure Project
- SaadiyatIsland Infrastructure Project
- Haramain High Speed Railway, Kingdom of Saudi Arabia
- RAS Al Zawr Aluminium Smelter Project – Bechtel KSA
Project Handled DS 151 Al Warqa’a 1 Sewerage & Drainage Project (Completed) - 2009DowntownJebel Ali Zone4 Infrastructure Project (under hold) – 2008DS 191 International city Sewerage Network and Pumping Station Project (Completed) - 2011 |
Oct’06 – Jan’08 | Sr. Engineer (Planning)with Galfar Engineering & Contracting S.A.O.G, Muscat, Oman Sewerage Treatment Plant - Al Ansab (Completed) Rehabilitation of Sewerage Treatment Plant & Network – Sur (Completed) |
| |
Aug’05 – Oct’06 | Deputy project Manager (Planning)with Shapoorji Pallonji Group,Bangalore, India Tata BP Solar Industry Plant Expansion Phase II (Completed) |
| |
Sep’03 – Aug’05 | Civil Engineer cum Quantity Surveyorwith Mfar Construction Pvt Ltd, Bangalore, India.(Sister concern of Galfar Engineering & Contracting, Oman) G+14 – 4Nos of Brigade Gardenia Residential Apartments – Bangalore, India |
Jun’99 – Aug’03 | Project Engineerwith ABC India Ltd, Mumbai, India (Sister Concern of Transport Corporation of India Ltd) 1. Associated Cement Company(ACC) Plant Expansion Project in Wadi, India
2. Indian Oil Corporation Ltd, Digboi Assam, India (DHDT Reactor) 3. TALA Hydro Electric Power Project, Bhutan 4. Nuclear Power Corporation of India Ltd Anu Sakthi Nagar, Mumbai 5. Indian Oil Corporation Ltd Panipat & Mathura Refinery Expansion project 6. Thermal Power Plant in Mizoram, India 7. Hydro Electric Power Plant Construction TALA, Bhutan |
| |
Skills/Expertise
| - Preparation of detailed Programme by selecting the appropriate techniques and sequence of events for project.
- Deciding and preparation of daily, weekly and monthly progress reports formats
- Implementation of construction schedule with project team.
- Daily monitoring of the progress/suggesting improvisation to ensure proper allocation /utilization of resources with optimum of time/Project cost.
- Lead planning meetings to ensure progress on track and enforce compliance to plan.
- Preparation of weekly progress reports with forecasting the material and man power requirements.
- Reporting to client/consultant daily, weekly and monthly basis.
- Updating the schedule and comparing the progress with target schedule submitted to client and with the internal target schedule.
- Define Milestones and Constrains.
- Responsible for sending notices to consultant in case of any variance or time claim in compliance of conditions of contract.
- Responsible to submit detained variation and time claim to consultant for approval.
- Responsible to make recovery schedule in case of any delay to finish the project on time.
- Responsible to check IPC (Interim Payment Certificate) prepared by Quantity Surveyor.
- Responsible to check work programme submitted by sub contractors that it should be in line with approved clause 14.1 base line programme.
- Responsible for cost control & Monthly Labour Forecast.
- Responsible to prepare CCVR (Construct Cost Value Reconciliation).
|
Computer Skills
| - Certified in Primavera Project Planner Primavera P3.1,5.0,6.1
- Certified in MS Excel, Word & Power point
- Certified in Auto Cad Re14
- Certified in STAAD Pro
- Knowledge in MS Project’03
- Knowledge in ERP-Systems
|
Professional Training & Membership
| - Member in IQSA (Indian Quantity Surveyor Association) UAE
- Member of Project Management Institute (PMI), USA
- Member of The Association for the Advancement of Cost Engineering International (AACEI), USA
- Undergone training program in Forensic Delay Analysis
- Undergone Training program in Construction Safety, Environmental Occupational Health & Safety (EOHS), Risk Analysis & Job Safety Analysis.
|
I do hereby declare that the above information furnished is correct and true to the best of my Knowledge.
M.Suresh Kumar