November, 2005 Enppi (Engineering for the Petroleum and Process Industries)
Company field: Engineering, Procurement Services, Construction Supervision, Commissioning and Start-up for Petroleum and Industrial Projects.
Post occupied: Planning Engineer
Duration: October 2003 – Present
Responsibilities as Project Planner:
•Preparing different levels of schedules in accordance with project WBS (Work Breakdown Structure) and client /contract requirements.
•Preparing periodical progress reports and presenting analyzed data to Top Management in progress review meetings.
•Coordinating, maintaining and updating project schedules, progress curves, man-hour expenditure and performance analysis.
•Responsibilities as Construction Planner:
•Contributing to the provision of information and guidance to ensure the productive and timely completion of the project through the preparation, coordination and continuous up-dating of an overall program for the site construction work.
•The study and assessment of the project target dates and work program related parameters.
•Assisting the Site Manager and the Construction Superintendent in the preparation of the construction plan.
•Collating work progress for sub-contractors in the Site Reports.
LOAN TO PROCUREMENT DEPARTMENT
Post occupied: Project Expeditor
Duration: April 2009 – Till end of year 2009
Responsibilities as project expeditor:
•Maintain accurate and up to date records on the status of all orders.
•Evaluate and analyze supplier’s fabrication schedules and progress.
•Monitor and review suppliers purchase orders and fabrication schedule.
•Contact suppliers for following up of engineering data submission, materials acquisition, progress and deliveries advice / status.
•Evaluate suppliers information and highlight on problem areas.
•Prepare, update and regularly issue the equipment / material status report periodically as required by project instructions.
LOAN TO PROJECT MANAGEMENT DEPARTMENT
Post occupied: Project Engineer
Duration: November 2008 – April 2009
Responsibilities as Project Engineer:
•Assist Project Manager in coordination and administering the project from project planning, engineering, procurement through construction, start-up and hand-over.
•Collaborates in developing and documenting the project scope, budget and overall schedule. Keep the Project Manager informed of the status of the project, highlighting deviation from plans.
•Issuing -under guidance from Project Manager- the project scope and procedures manual.
•Ensuring the organization of a competent project team.
•Establishing clear project execution/cost control plans and project schedule, to be able to meet contractual requirements and identify/predict deviations.
•Compiles, collects and assembles the material for management and client meetings as requested. Prepares agendas, makes necessary arrangements, drafts minutes and action lists.
•Issuing detailed periodic progress report to client.
•Upon project completion, ensuring that company’s policies and procedure are implemented to facilitate smooth hand-over to client.
•Acting as a liaison between the company and the client during performance guarantee period.
Project’s Name: (PDVSA) IV Train San Joaquin Jose 250 Project (Venezuela) (May.06 till November 2008)
Post occupied: Lead Project Planner
Brief Description of Project:
PDVSA intends to construct a new NGL Extraction Plant (IV Train in San Joaquin, Venezuela) of natural gas.
Project’s Name: (BP/GUPCO) Rehabilitation Project (Sept.05 till May 06)
Post occupied: Project Planner
Brief Description of Project:
Rehabilitate the existing facilities to assure the complete system can operate safely. Carrying out the necessary design and engineering activities related to the evaluation of facilities; assess their condition, recommend and engineering agreed remedial work based on the ‘as is’ condition of each facility.
Project’s Name:(GPC) Al Hamd Platform, 8" Pipeline & Power Cable (Nov.04 till Sept. 05)
Post occupied: Project Planner
Brief Description of Project:
Turnkey Project for installing a wellhead platform at Ras Bakr concession to feed crude oil to onshore facilities via production flow line.
Project’s Name:(PMS) Engineering for 6" & 8" Submarine Pipeline (Oct. ’04 till March ’05)
Post occupied: Project Planner
Brief Description of Project:
Engineering for 2 submarine crude oil pipelines from platform to shore point.
Project’s Name: UGDC NGL Plant – Port Said (Oct ’03 till Sept. ’04)
Brief Description of Project:
NGL Extraction Plant (Pre–commissioning, Commissioning and Start–up)
Post occupied: Construction Planner (at Site)
Enppi (Engineering for the Petroleum and Process Industries)
Post occupied: Proposals & Contracts Engineer
Duration: April 2003 – Sept 2003
Responsibilities:
•Leading proposal group.
•Preparing inquiry summary for Chairman and CEO’s approval.
•Chairing proposal kickoff meeting.
•Obtaining and discussing proposal man-hours estimate.
•Implementing the relevant requirements of QMS & EMS. (Quality and Environmental Management Systems)
I.T.I. (Information Technology International)
Company field:IT Solutions, Computers, N/Ws and P.O.S. Equipment
Post occupied:Planning and Business development
Duration:June 2002 – March 2003
Responsibilities:
•Expanding current operation in P.O.S. solutions, exploring new business opportunities in the IT and telecom fields.
•Planning of projects execution phase.
•Managing /planning manpower availability.
•Preparing yearly/quarterly stock plan.
Eagle Industry
Company field:Metallurgical Industry
Post occupied:Head of Marketing and Sales Department (September 2001 – May 2002)
Sales Engineer (September 2000 - September 2001)
Responsibilities:
•Exploring new industries to expand the factory product range to serve new market sectors.
•Defining the prices in regards to competition.
•Expanding base of clients.
EDUCATION
Arab Academy for Sciences & Technology Bachelor of Science – Mechanical Engineering, August’99
International School of Choueifat International General Certificate for
Secondary Education, IGCSE (Abu Dhabi), June 1993
PART TIME INTERNSHIPS
ITAMCO-Ghabbour
Company field: Car Manufacturer and Service Center
Post occupied: Training Service Engineer P.D.I. section (Pre Delivery Inspection)
Duration: February 2000 till August 2000
Responsibilities:
•Supervising technicians of the P.D.I. section responsible for servicing cars directly assembled prior to distribution to showrooms and outlets.
SKILLS
Computer Primavera 3.0, Primavera Enterprise and MS Project.
Languages Excellent command of written & spoken English and Arabic. Some understanding of French and Spanish.
Typing English & Arabic
Communication Attended many communication courses adding to it the experience from different multi discipline jobs.
TRAVEL
• Venezuela , Saudi Arabia (6months), England (1 year), United Arab Emirates (11 years)
• London - Belgium -Paris.
TRAINING ATTENDED
Enppi
Date Duration Course Description Type
Sept. ’03 5 Days Introduction To Gas Processing & Treatment Technical
Nov. ’03 8 Days Orientation program & Training Program General
Dec. ’03 10 Days Technical Report writing Technical
Jan. ’04 1 Day LNG/NGL Awareness Session Technical
Feb. ’04 14 Days On-Site Training in UGD LNG Plant – Port Said Technical
March ’04 2 Days Overview of Process Engineering for Non-Process Engineers Technical
March ’04 2 Days Overview of Instrument Engineering for Non-Instrument Engineers Technical
April ’04 2 Days Overview of Piping Engineering for Non-Piping Engineers Technical
April ’04 2 Days Overview of Civil Engineering for Non-Civil Engineers Technical
April ’04 2 Days Overview of Equipment Fabrication for Non-Equipment Engineers Technical
May ’04 2 Days Overview for Electrical Engineering for Non-Electrical Engineers Technical
May ’04 2 Days Overview for Mechanical Engineering for Non-Mechanical Staff Technical
May ’04 2 Days Overview of E&I Installation for Others Technical
June ’04 2 Days Effective Communication Skills General
July ’04 2 Days Effective Meeting Skills General
July ’04 2 Days Time Management Workshop General
Oct ’04 5 Days Project Planning and Scheduling Technical
Dec 04 5 days Microsoft Access General
April ‘05 5 Days Primavera Project Planner for the Enterprise version 4.1 Technical
April ‘05 3 Days Course #102 Planning and Controlling with P3e/c Technical
April ‘05 3 Days Course #106 Advanced Topics for P3e/c Technical
April ‘06 2 Months Introduction to Spanish Language Level I + II General
I.T.I.
Date Duration Course Description Type
June ’02 3 Days Orientation Program General
July ’02 5 Days Technical Points of Machines Technical
July ’02 14 Days Hardware Enhancing Workshop Technical
Eagle Industry
Date Duration Course Description Type
Nov. ’00 7 Days Departments overview training Program General
Dec. ’00 14 Days Factory Production Phases overall training Technical
Company field: Engineering, Procurement Services, Construction Supervision, Commissioning and Start-up for Petroleum and Industrial Projects.
Post occupied: Planning Engineer
Duration: October 2003 – Present
Responsibilities as Project Planner:
•Preparing different levels of schedules in accordance with project WBS (Work Breakdown Structure) and client /contract requirements.
•Preparing periodical progress reports and presenting analyzed data to Top Management in progress review meetings.
•Coordinating, maintaining and updating project schedules, progress curves, man-hour expenditure and performance analysis.
•Responsibilities as Construction Planner:
•Contributing to the provision of information and guidance to ensure the productive and timely completion of the project through the preparation, coordination and continuous up-dating of an overall program for the site construction work.
•The study and assessment of the project target dates and work program related parameters.
•Assisting the Site Manager and the Construction Superintendent in the preparation of the construction plan.
•Collating work progress for sub-contractors in the Site Reports.
LOAN TO PROCUREMENT DEPARTMENT
Post occupied: Project Expeditor
Duration: April 2009 – Till end of year 2009
Responsibilities as project expeditor:
•Maintain accurate and up to date records on the status of all orders.
•Evaluate and analyze supplier’s fabrication schedules and progress.
•Monitor and review suppliers purchase orders and fabrication schedule.
•Contact suppliers for following up of engineering data submission, materials acquisition, progress and deliveries advice / status.
•Evaluate suppliers information and highlight on problem areas.
•Prepare, update and regularly issue the equipment / material status report periodically as required by project instructions.
LOAN TO PROJECT MANAGEMENT DEPARTMENT
Post occupied: Project Engineer
Duration: November 2008 – April 2009
Responsibilities as Project Engineer:
•Assist Project Manager in coordination and administering the project from project planning, engineering, procurement through construction, start-up and hand-over.
•Collaborates in developing and documenting the project scope, budget and overall schedule. Keep the Project Manager informed of the status of the project, highlighting deviation from plans.
•Issuing -under guidance from Project Manager- the project scope and procedures manual.
•Ensuring the organization of a competent project team.
•Establishing clear project execution/cost control plans and project schedule, to be able to meet contractual requirements and identify/predict deviations.
•Compiles, collects and assembles the material for management and client meetings as requested. Prepares agendas, makes necessary arrangements, drafts minutes and action lists.
•Issuing detailed periodic progress report to client.
•Upon project completion, ensuring that company’s policies and procedure are implemented to facilitate smooth hand-over to client.
•Acting as a liaison between the company and the client during performance guarantee period.
Project’s Name: (PDVSA) IV Train San Joaquin Jose 250 Project (Venezuela) (May.06 till November 2008)
Post occupied: Lead Project Planner
Brief Description of Project:
PDVSA intends to construct a new NGL Extraction Plant (IV Train in San Joaquin, Venezuela) of natural gas.
Project’s Name: (BP/GUPCO) Rehabilitation Project (Sept.05 till May 06)
Post occupied: Project Planner
Brief Description of Project:
Rehabilitate the existing facilities to assure the complete system can operate safely. Carrying out the necessary design and engineering activities related to the evaluation of facilities; assess their condition, recommend and engineering agreed remedial work based on the ‘as is’ condition of each facility.
Project’s Name:(GPC) Al Hamd Platform, 8" Pipeline & Power Cable (Nov.04 till Sept. 05)
Post occupied: Project Planner
Brief Description of Project:
Turnkey Project for installing a wellhead platform at Ras Bakr concession to feed crude oil to onshore facilities via production flow line.
Project’s Name:(PMS) Engineering for 6" & 8" Submarine Pipeline (Oct. ’04 till March ’05)
Post occupied: Project Planner
Brief Description of Project:
Engineering for 2 submarine crude oil pipelines from platform to shore point.
Project’s Name: UGDC NGL Plant – Port Said (Oct ’03 till Sept. ’04)
Brief Description of Project:
NGL Extraction Plant (Pre–commissioning, Commissioning and Start–up)
Post occupied: Construction Planner (at Site)
Enppi (Engineering for the Petroleum and Process Industries)
Post occupied: Proposals & Contracts Engineer
Duration: April 2003 – Sept 2003
Responsibilities:
•Leading proposal group.
•Preparing inquiry summary for Chairman and CEO’s approval.
•Chairing proposal kickoff meeting.
•Obtaining and discussing proposal man-hours estimate.
•Implementing the relevant requirements of QMS & EMS. (Quality and Environmental Management Systems)
I.T.I. (Information Technology International)
Company field:IT Solutions, Computers, N/Ws and P.O.S. Equipment
Post occupied:Planning and Business development
Duration:June 2002 – March 2003
Responsibilities:
•Expanding current operation in P.O.S. solutions, exploring new business opportunities in the IT and telecom fields.
•Planning of projects execution phase.
•Managing /planning manpower availability.
•Preparing yearly/quarterly stock plan.
Eagle Industry
Company field:Metallurgical Industry
Post occupied:Head of Marketing and Sales Department (September 2001 – May 2002)
Sales Engineer (September 2000 - September 2001)
Responsibilities:
•Exploring new industries to expand the factory product range to serve new market sectors.
•Defining the prices in regards to competition.
•Expanding base of clients.
EDUCATION
Arab Academy for Sciences & Technology Bachelor of Science – Mechanical Engineering, August’99
International School of Choueifat International General Certificate for
Secondary Education, IGCSE (Abu Dhabi), June 1993
PART TIME INTERNSHIPS
ITAMCO-Ghabbour
Company field: Car Manufacturer and Service Center
Post occupied: Training Service Engineer P.D.I. section (Pre Delivery Inspection)
Duration: February 2000 till August 2000
Responsibilities:
•Supervising technicians of the P.D.I. section responsible for servicing cars directly assembled prior to distribution to showrooms and outlets.
SKILLS
Computer Primavera 3.0, Primavera Enterprise and MS Project.
Languages Excellent command of written & spoken English and Arabic. Some understanding of French and Spanish.
Typing English & Arabic
Communication Attended many communication courses adding to it the experience from different multi discipline jobs.
TRAVEL
• Venezuela , Saudi Arabia (6months), England (1 year), United Arab Emirates (11 years)
• London - Belgium -Paris.
TRAINING ATTENDED
Enppi
Date Duration Course Description Type
Sept. ’03 5 Days Introduction To Gas Processing & Treatment Technical
Nov. ’03 8 Days Orientation program & Training Program General
Dec. ’03 10 Days Technical Report writing Technical
Jan. ’04 1 Day LNG/NGL Awareness Session Technical
Feb. ’04 14 Days On-Site Training in UGD LNG Plant – Port Said Technical
March ’04 2 Days Overview of Process Engineering for Non-Process Engineers Technical
March ’04 2 Days Overview of Instrument Engineering for Non-Instrument Engineers Technical
April ’04 2 Days Overview of Piping Engineering for Non-Piping Engineers Technical
April ’04 2 Days Overview of Civil Engineering for Non-Civil Engineers Technical
April ’04 2 Days Overview of Equipment Fabrication for Non-Equipment Engineers Technical
May ’04 2 Days Overview for Electrical Engineering for Non-Electrical Engineers Technical
May ’04 2 Days Overview for Mechanical Engineering for Non-Mechanical Staff Technical
May ’04 2 Days Overview of E&I Installation for Others Technical
June ’04 2 Days Effective Communication Skills General
July ’04 2 Days Effective Meeting Skills General
July ’04 2 Days Time Management Workshop General
Oct ’04 5 Days Project Planning and Scheduling Technical
Dec 04 5 days Microsoft Access General
April ‘05 5 Days Primavera Project Planner for the Enterprise version 4.1 Technical
April ‘05 3 Days Course #102 Planning and Controlling with P3e/c Technical
April ‘05 3 Days Course #106 Advanced Topics for P3e/c Technical
April ‘06 2 Months Introduction to Spanish Language Level I + II General
I.T.I.
Date Duration Course Description Type
June ’02 3 Days Orientation Program General
July ’02 5 Days Technical Points of Machines Technical
July ’02 14 Days Hardware Enhancing Workshop Technical
Eagle Industry
Date Duration Course Description Type
Nov. ’00 7 Days Departments overview training Program General
Dec. ’00 14 Days Factory Production Phases overall training Technical