Dear All

1. A schedule which is not correctly or completely loaded
cannot produce a complete plan%, right?

2. A schedule need to be cost loaded in order to get the schedule % complete at the WBS level and at the total roll-up.

Member for

7 years 5 months

Build a matrix driven by Cost, Duration, Resources (Manpower) requirements.

The Weightage then will be clear where you have more and less. 

Member for

16 years 3 months

whats your measuring stick ?

The Idea takes time

a Study Takes time

the Design takes time 

the Implementation takes time 

what do all of these have in common ? TIME

how is time measured ?

Usually in manhours 

So figured out the manhours for each of these stages and you have your weights