Planning, Scheduling & Programming Discussion Member for 7 years 2 months Member for 7 years 2 months Submitted by glasgow_liam on Mon, 2019-07-01 14:04 Permalink Thanks Zoltan Thanks Zoltan Member for 16 years 3 months Member for 16 years 4 months Submitted by Zoltan Palffy on Fri, 2019-06-28 16:25 Permalink install the sample projects install the sample projects that come with p6 terms you have clearning & grubbing excavation sub ballest ballest ties rail if its tird rail this is where your power comes from if not you have overhead Catenary trackion power wayside equipment substations signals thats about it Log in or register to post comments
Member for 7 years 2 months Member for 7 years 2 months Submitted by glasgow_liam on Mon, 2019-07-01 14:04 Permalink Thanks Zoltan Thanks Zoltan
Member for 16 years 3 months Member for 16 years 4 months Submitted by Zoltan Palffy on Fri, 2019-06-28 16:25 Permalink install the sample projects install the sample projects that come with p6 terms you have clearning & grubbing excavation sub ballest ballest ties rail if its tird rail this is where your power comes from if not you have overhead Catenary trackion power wayside equipment substations signals thats about it
Member for
7 years 2 monthsThanks Zoltan
Thanks Zoltan
Member for
16 years 3 monthsinstall the sample projects
install the sample projects that come with p6
terms you have
clearning & grubbing
excavation
sub ballest
ballest
ties
rail
if its tird rail this is where your power comes from if not you have overhead Catenary trackion power
wayside equipment
substations
signals
thats about it