If it makes a difference; I'm working for a start-up and this will be our first production line - it isn't "running" yet beyond ad-hoc engineering trials
Thanks
Member for
16 years 3 months
Member for16 years4 months
Submitted by Zoltan Palffy on Tue, 2019-06-25 14:44
Member for
16 years 3 monthsI mean assign a resource for
I mean assign a resource for each activity and assign the cost for that resource based on the activity being performed.
Member for
6 years 4 monthsHi ZoltanWhat do you mean
Hi Zoltan
What do you mean "resource load"?
If it makes a difference; I'm working for a start-up and this will be our first production line - it isn't "running" yet beyond ad-hoc engineering trials
Thanks
Member for
16 years 3 monthsresource load each activity
resource load each activity in the schedule with costs
this wil give you your anticipated WIP value