From P3e 3.5 to now P6, graphic report is one of the weakness that everyone is complaint. But if you are using the P6 web access then some good graphical report can be produce though the portfolio layout.
Al
Member for
19 years
Member for19 years
Submitted by Rodel Marasigan on Sun, 2007-10-21 22:43
P5 dont have graphical reports save like P3. Its WYSWYG option (what you see what you get). Means what ever you have on your screen is your graphical report. You can have different layouts saves under view->layout on P5 menu.
Member for
20 years 3 monthsRE: where is graphical cost and resource loading in P5
Hi,
Besides graphical reports generated in P3 has its own flaw: not presentable.
Regards,
Ed
Member for
22 years 9 monthsRE: where is graphical cost and resource loading in P5
Yep
From P3e 3.5 to now P6, graphic report is one of the weakness that everyone is complaint. But if you are using the P6 web access then some good graphical report can be produce though the portfolio layout.
Al
Member for
19 yearsRE: where is graphical cost and resource loading in P5
Mohammad,
P5 dont have graphical reports save like P3. Its WYSWYG option (what you see what you get). Means what ever you have on your screen is your graphical report. You can have different layouts saves under view->layout on P5 menu.
Hope this help