Isn't every Actual Duration longer than the baseline duration with float a concurrent delay? - taking into account possible changes since the baseline (maybe).
Isn't every Actual Duration longer than the baseline duration with float a concurrent delay? - taking into account possible changes since the baseline (maybe).