START Date:
April, 2000
END Date:
November, 2001 Development of schedules for design and installation of the SCADA remote operating systems for Great Man Made River Phase 2 (the pumping of fresh water from an underground lake through 1,000km of 5m diameter Water Pipe and Pumping Stations between south Libya and Tripoli).
Experience Hours (Planning & Scheduling):
2750