Which better? 7 Day Calendar or 5 Day/working day Calendar for HIGH LEVEL 2 PAGE Design Build type schedule?
- This is working on the assumption that when you want to keep it basic and high level that you don't want to mix calendars at that point because then you have to add a calendar column etc. I think the 7 day calendar is better for this type of schedule, but want your opinion.