Hello
Is it possible to have users set up to add/edit project level layouts in P6 without them also being able to add/edit global layouts?
Trying to lock down the global data we currently hold without reams of additional global data being generated, and aim to reassign layouts etc to be owned at project level for specific planners to maintain, but in doing this none now have access to edit these project layouts.
Is there a way to achieve this whilst at the same time locking down global rights to one or two users?
Thanks