How do I go about in assingning resources with a specific % usage within P6? Looking to mirrior the same function as in Microsoft projects resources. Anythings helps. Thanks.
How do I go about in assingning resources with a specific % usage within P6? Looking to mirrior the same function as in Microsoft projects resources. Anythings helps. Thanks.
Links:
[1] http://www.planningplanet.com/forums/oracle-primavera-pm6