I want to compare the Physical % complete to the BL1 Physical % complete in a filter to show work accomplished in a weeks time period. Can I build the filter in P6?
Thanks for your help
I want to compare the Physical % complete to the BL1 Physical % complete in a filter to show work accomplished in a weeks time period. Can I build the filter in P6?
Thanks for your help