Hello Everyone,
Could you please guide me on the subject " 91R-16 AACE - Schedule Development" - AACE based.
I found this as a requirement on a ITT (Instruction to Tenderers), but have no idea if there is something different in preparing the schedule. I have prepared lots of schedule but not sure which standart it follows.
So by the above standards should I consider something esle.
Regards
Jithin